Товары — Электропитание и распределение

Lead-Acid Starter Battery 12V 100Ah for Cars 6СТ-100VL(VLR)

Аккумуляторная батарея 6СТ-100VL(VLR)

₽4 000-6 000
ООО "КАЗ" 🇷🇺
Lead-Acid Battery for Starting Piston Engines 6ST-62 "ELAB

Аккумулятор свинцовый для запуска поршневых двигателей 6СТ-62 "ELAB"

₽2 500-3 500
ООО "ЕЛАБУЖСКИЙ АККУМУЛЯТОРНЫЙ ЗАВОД" 🇷🇺
Lead-Acid Battery 6ST-38 (L, VL, EFB, VRLA, C)

Аккумуляторная батарея 6СТ-38(L,VL,EFB,VRLA,C)

₽2 500-3 500
ООО "ЕЛАБУЖСКИЙ АККУМУЛЯТОРНЫЙ ЗАВОД" 🇷🇺
Lead-Acid Starter Battery 6ST-90VL ACOM Euro

Аккумуляторная батарея 6СТ-90VL АКОМ Euro

₽6 000-8 000
АО "АКОМ им. Н.М. Игнатьева" 🇷🇺
SPARTA High Energy Euro 6ST-63VL 12V Starter Battery

Аккумуляторная батарея 6СТ-63VL SPARTA High Energy Euro

₽4 500-6 000
АО "АКОМ им. Н.М. Игнатьева" 🇷🇺
12V Lead-Acid Starter Battery 6ST-74VL Akom LB Euro

Аккумуляторная батарея 6СТ-74VL Аком LB Euro

₽5 000-7 000
АО "АКОМ им. Н.М. Игнатьева" 🇷🇺
Lead-Acid Starter Battery 6ST-74VL SPARTA Energy Euro LB

Аккумуляторная батарея 6СТ-74VL SPARTA Energy Euro LB

₽3 500-4 500
АО "АКОМ им. Н.М. Игнатьева" 🇷🇺
75Ah EFB Lead-Acid Starter Battery for Gas Engines - A21R22.3703010

Аккумуляторная батарея 6СТ-75VL EFB Евро ГАЗ /А21R22.3703010

₽4 500-6 000
АО "АКОМ им. Н.М. Игнатьева" 🇷🇺
Lithium-Ion Battery ICGP6.7/135/150 for Standalone Power Supply

Аккумулятор ICGP6,7/135/150

₽1 500-3 000
АО "УРАЛЭЛЕМЕНТ" 🇷🇺
High-Capacity Lithium-Ion Battery ICP7/135/150

Аккумулятор ICP7/135/150

₽1 500-2 500
АО "УРАЛЭЛЕМЕНТ" 🇷🇺
12V Lead Acid Starter Battery with 132Ah Capacity - 6СТ-132N(NR)

Аккумуляторная батарея 6СТ-132N(NR)

₽7 000-9 000
ООО "КАЗ" 🇷🇺
12V Lead-Acid Starter Battery 65Ah for Cars 6СТ-65VL(VLR)

Аккумуляторная батарея 6СТ-65VL(VLR)

₽2 500-4 500
ООО "КАЗ" 🇷🇺
Lead-Acid Starter Battery L5 100Ah Euro Model 200003-3703110-00

200003-3703110-00 Батарея аккумуляторная L5 100Aч евро

₽7 000-9 000
АО "АКОМ им. Н.М. Игнатьева" 🇷🇺
12V Lead-Acid Starter Battery 6ST-74VL STALWART Expert Euro

Аккумуляторная батарея 6СТ-74VL STALWART Expert Euro

₽3 500-5 000
АО "АКОМ им. Н.М. Игнатьева" 🇷🇺
Premium EFB Lead-Acid Starter Battery 6ST-65VL STALWART

Аккумуляторная батарея 6СТ-65VL STALWART Premium Euro

₽5 000-7 000
АО "АКОМ им. Н.М. Игнатьева" 🇷🇺
Starter Lead-Acid Battery 6СТ-95N(NR) 12V 95Ah

Аккумуляторная батарея 6СТ-95N(NR)

₽2 500-3 500
ООО "КАЗ" 🇷🇺
Cylindrical Lithium-Ion Battery LITZ-2.5E

Аккумулятор ЛИЦ-2,5Е

₽250-400
АО "УРАЛЭЛЕМЕНТ" 🇷🇺
Complete Workshop Transformer Substations for Industrial Use

Комплектные трансформаторные подстанции Цехового типа

₽1 500 000-5 000 000
ООО "ЭНЕРГОМАШСЕРВИС" 🇷🇺
Complete Transformer Substations for Voltage Conversion

Комплектные трансформаторные подстанции

₽500 000-5 000 000
ООО "НПП "ТЕРРАВАТТ" 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.