Товары — Резервуары, ёмкости и баки

Water Tower VBR-160 for Efficient Water Supply Management

Водонапорная башня ВБР-160

₽2 500 000-4 000 000
RTP Prigorodnoe LLC 🇷🇺
Underground Storage Tanks EП - Horizontal Cylindrical Design

Ёмкости подземные, типа ЕП.

₽250 000-1 500 000
ZNHO LLC 🇷🇺
Reliable Polypropylene Tanks for Water and Fuel Storage

Емкости из полипропилена

₽15 000-500 000
AGROINZHPROM LLC 🇷🇺

Разместите заявку на закупку

Получите предложения от проверенных поставщиков

Экономьте время
Water Tower VBR-160 for Effective Water Supply Management

Водонапорная башня ВБР-160

₽2 500 000-4 000 000
BLOCK OJSC 🇷🇺
Marine Pneumatic Tank for Liquid Storage and Supply

Пневмоцистерна судовая

₽150 000-300 000
DIALOG-TECHNICA LLC 🇷🇺
Cream Maturation Tank Y1-OSV for Dairy Products

Резервуар Я1-ОСВ

₽1 500 000-2 500 000
Pischevik Engineering LLC 🇷🇺
Cream Storage Tank with Mixer

Емкость для сливок

₽2 500 000-7 000 000
TSVET OJSC 🇷🇺
Underground Storage Tanks for Oil and Fuels

Резервуары подземные

₽1 500 000-3 000 000
ALTAIVAGON OJSC 🇷🇺
Underground Horizontal Tank M-EP 8m³

Резервуар (емкость) М-ЕП-8

₽250 000-400 000
MAGNUM LLC 🇷🇺
Water Tower for Water Supply Pressure Regulation

Водонапорная башня

₽500 000-5 000 000
BLOCK OJSC 🇷🇺
Bitumen Tank Hatch LЦ-B-500

Люк цистерны битумный ЛЦ-Б-500

₽150 000-250 000
ELECTROMAGNIT CJSC 🇷🇺
GRINLOS Well - Multifunctional Engineering Device

ГРИНЛОС Колодец

₽15 000-50 000
AGROINZHPROM LLC 🇷🇺
Insulated Milk Storage Tank, Model ET-1500

Емкость термос (ЕТ) ЕТ-1500

₽250 000-500 000
MILKAGROSERVICE LLC 🇷🇺
Vertical Storage Tank RVS ZS with Protective Mesh

Резервуар вертикальный типа "РВС ЗС"

₽1 500 000-15 000 000
RSK-GROUP LLC 🇷🇺
Water Tower VBR-15 for Efficient Water Supply

Водонапорная башня ВБР-15

₽1 500 000-2 500 000
BLOCK OJSC 🇷🇺
Metal Water Storage Tank for Temporary Water Collection

Емкости металлические для воды

₽500 000-2 500 000
BLOCK OJSC 🇷🇺
Water Tower VBR-25 for Water Supply Regulation

Водонапорная башня ВБР-25

₽1 500 000-2 500 000
RTP Prigorodnoe LLC 🇷🇺
Modular Pool Bottom for Depth Reduction

Второе дно (модульное)

₽150 000-600 000
BLOCK OJSC 🇷🇺

Часто задаваемые вопросы

What information does a fabricator need to quote a custom tank?
Five things: stored medium and its temperature, working volume, orientation and installation type (underground, surface, elevated), site climate, and any internal equipment such as heating coils or mixers. With that, the plant proposes material, wall thickness and a general arrangement drawing, usually within a week, and a firm price tied to current steel cost.
How are large tanks shipped if they exceed container dimensions?
Three routes are used. Vessels under roughly 3.2 metres diameter travel whole by truck or flat-rack. Larger tanks are fabricated in shell sections, shipped compactly, then welded on site — the plant supplies assembly drawings and can send a welding supervisor. Field-erected designs bolt or weld from panels for the biggest volumes.
Are septic tanks and treatment plants sized for local regulations?
Suppliers size treatment equipment from your inflow data — population equivalent or daily volume and contamination levels — and guarantee outlet parameters in the contract. You then check those outlet figures against your national discharge norms. Plants regularly adjust process stages, adding tertiary treatment or disinfection, to meet stricter local limits.
What corrosion protection is applied for underground installation?
Standard practice is abrasive blasting followed by reinforced bitumen-polymer or polyurethane external coating, with thickness measured and recorded. Internally, the lining matches the medium — from epoxy for fuels to food-grade coatings or bare stainless steel. Cathodic protection points can be welded in if your site plan uses them.
How long does fabrication take from drawing approval?
Simple single-wall tanks up to 25 cubic metres typically take 3–5 weeks from approved drawings. Stainless process vessels, double-wall fuel tanks and packaged treatment plants run 6–10 weeks depending on complexity and internal equipment. Add transport: 1–2 weeks overland to Central Asia, 4–6 weeks by sea to the Gulf or Africa.