Товары — Электропитание и распределение

Electrolyte P=1.09 for Battery Maintenance

Электролит P=1,09

₽50-150
ELECTROTYAGA OJSC 🇷🇺
High-Frequency Interference Suppressor VCHZ-200-0.5

Высокочастотный заградитель ВЧЗ-200-0,5

₽150 000-250 000
MULTIPROCESSING LLC 🇷🇺
Multiplexer Adapter MA-01 for Connecting Three External Microphones

Мультиплексор-адаптер МА-01

₽5 000-10 000
ELKOM LLC 🇷🇺
Grounding Drum BZZ-20.01 for Electrical Connection

Барабан заземления БЗЗ-20.01

₽1 500-3 000
ELECTROMAGNIT CJSC 🇷🇺
Polymer Insulator with Protective Silicone Rubber Shell, OCK 8-35-3 UHL1

Изолятор ОСК 8-35-3 УХЛ1

₽2 500-4 000
IZOLYATOR OJSC 🇷🇺
Shunt Device SHU-300-02 ET for Electrical Systems

Шунтирующее устройство ШУ-300-02 ЭТ

₽500-1 500
ELECTROMASHINA OJSC 🇷🇺

Разместите заявку на закупку

Получите предложения от проверенных поставщиков

Экономьте время
Polymer Insulator with Protective Silicone Rubber Shell OCK 10-110-B-06-2 UHL1

Изолятор ОСК 10-110-Б-06-2 УХЛ1

₽15 000-25 000
IZOLYATOR OJSC 🇷🇺
Electric Energy Trading Solutions - Efficient Market Access

Торговля электроэнергией

₽1 000 000-100 000 000
123 ARZ OJSC 🇷🇺
Ankle Joint Support Bandage BN6-65

Бандаж на голеностопный сустав БН6-65

₽800-1 500
Federal State Budgetary Institution Federal Bureau of Medical and Social Expertise of the Ministry of Labour of Russia 🇷🇺
Polymer Insulator OCK 20-10-E05-3 UHL1 for Electrical Installations

Изолятор ОСК 20-10-Е05-3 УХЛ1

₽1 500-3 000
ENERGIYA + 21 OJSC 🇷🇺
High-Frequency Attenuator VChZ-630-2.0

Высокочастотный заградитель ВЧЗ-630-2,0

₽150 000-300 000
MULTIPROCESSING LLC 🇷🇺
Voltage Limiter ON-375 for Power Supply Unit BPL 275-12

Ограничитель напряжения ОН-375

₽15 000-25 000
URALTECHIS LLC 🇷🇺
Excitation System STSN-2P-270-1900-2.5 UHL4

Система возбуждения СТСН-2П-270-1900-2,5 УХЛ4

₽15 000 000-25 000 000
SILOVYE MASHINY OJSC 🇷🇺
Polymer Insulator OCK 8-35-B01-2 UHL1 for Power Equipment

Изолятор ОСК 8-35-Б01-2 УХЛ1

₽1 500-3 000
ENERGIYA + 21 OJSC 🇷🇺
High-Frequency Interference Suppressor VCHZ-630-0.5

Высокочастотный заградитель ВЧЗ-630-0,5

₽150 000-250 000
MULTIPROCESSING LLC 🇷🇺
High-Frequency Suppressor VCHZ-2000-0.5

Высокочастотный заградитель ВЧЗ-2000-0,5

₽150 000-250 000
MULTIPROCESSING LLC 🇷🇺
Phase-shielded Busbar System TENE for Generators

Токопровод типа ТЭНЕ

₽5 000 000-20 000 000
MESCH LLC 🇷🇺
Low Voltage Busbar Type SHZK for Industrial Connectors

Шинопровод типа ШЗК

₽15 000-50 000
MESCH LLC 🇷🇺
Voltage Boosting Device UVD3V

Устройство вольтодобавки УВД3В

₽50 000-100 000
Electropribor OJSC 🇷🇺
Diesel Generator Set ED2x16-T400-1VK

Установка генераторная ЭД2х16-Т400-1ВК

₽7 000 000-12 000 000
ELECTROAGGREGATE OJSC 🇷🇺
Cold Vulcanization Stabilizer 222-08

Стабилизатор 222-08

₽500-1 500
GNIIKhTEOS OJSC 🇷🇺
Voltage Isolation Block Type BR for DC Measurement

Блок развязки типа БР

₽15 000-30 000
NIIEFA-ENERGO-SEVERO-ZAPAD LLC 🇷🇺
220V Charging Device for Personnel and Transport Registration

Устройство зарядное 220В

₽3 000-5 000
URALTECHIS LLC 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.