Товары — Двигатели и генераторы

Diesel Generator Set ED2x16-T400-1VKS

Установка генераторная ЭД2х16-Т400-1ВКС

₽7 000 000-12 000 000
ELECTROAGGREGATE OJSC 🇷🇺
Van de Graaff Generator with Simulation Program

Генератор Ван-де-Граафа

₽15 000-30 000
SCIENTIFIC ENTERTAINMENTS LLC 🇷🇺

Разместите заявку на закупку

Получите предложения от проверенных поставщиков

Экономьте время
Random Sequence Generator Криптон USB/ДСЧ КБДЖ.469435.052

Криптон USB/ДСЧ КБДЖ.469435.052

₽15 000-25 000
ANKAD LLC 🇷🇺
Rotor Frame Cover M03-C5-20-030866

M03-C5-20-030866 - A – Крышка ротора

₽500-1 500
LAZER-KM LLC 🇷🇺
High Holding Power Anchor PDSB TU6411-001-03149576-2013

Якорь ПДСБ ТУ6411-001-03149576-2013

₽15 000-450 000
METMASH LLC 🇷🇺
Industrial Diesel Engine TM-600

Дизель промышленный ТМ-600

₽15 000 000-25 000 000
Dieselzipservis LLC 🇷🇺
Three-Phase Power Supply Station 400V, ED200-T400-1RK

Электростанция ЭД200-Т400-1РК

₽2 500 000-4 000 000
ELECTROAGGREGATE OJSC 🇷🇺
Three-Phase Power Supply Station ED100-T230P-1RK

Электростанция ЭД100-Т230П-1РК

₽7 000 000-12 000 000
ELECTROAGGREGATE OJSC 🇷🇺
Diesel Generator Set ED2x8-T400-1VKS

Установка генераторная ЭД2х8-Т400-1ВКС

₽7 000 000-12 000 000
ELECTROAGGREGATE OJSC 🇷🇺
Excitation System STS-REM 330-130-2.5 for Synchronous Generators

Система возбуждения СТС-РЭМ-330-130-2,5

₽1 500 000-2 500 000
RUSELPROM-ELECTROMASH LLC 🇷🇺
Generator Set ED16-T400-1VPM1 for Internal Combustion Engines

Установка генераторная ЭД16-Т400-1ВПМ1

₽1 500 000-2 500 000
ELECTROAGGREGATE OJSC 🇷🇺
Exponential Current Pulse Generator G6-51/1

Генератор импульсов тока Г6-51/1

₽150 000-250 000
OSTEK-ELEKTRO LLC 🇷🇺
High-Power Current Pulse Generator G6-51/2

Генератор импульсов тока Г6-51/2

₽150 000-300 000
OSTEK-ELEKTRO LLC 🇷🇺
Low Pressure Cylinder Rotor CND Drawing 48T230-3275CBR

Ротор ЦНД (чертеж 48Т230-3275СБР)

₽5 000 000-15 000 000
URALENERGOREMONT OJSC 🇷🇺
Three-Phase Power Supply Station ED60-T230P-1RAM4

Электростанция ЭД60-Т230П-1РАМ4

₽7 000 000-10 000 000
ELECTROAGGREGATE OJSC 🇷🇺
Three-Phase Power Generator ED16-T400-1RP

Электростанция ЭД16-Т400-1РП

₽1 500 000-2 500 000
ELECTROAGGREGATE OJSC 🇷🇺
Electromagnetic Relay REK61 - Reliable Switching Solution

Реле электромагнитное РЭК61

₽150-300
Northern Zarya OJSC 🇷🇺

Часто задаваемые вопросы

Can motors be wound for 60 Hz or non-standard voltages?
Yes. Standard production is 380 V 50 Hz, but plants wind for 400, 415, 440 or 660 V and for 60 Hz networks to order. State the exact grid parameters and whether the motor will run on a variable frequency drive; the factory adjusts the design and documents performance at your frequency in the test report.
Will a Russian motor mount in place of my existing IEC machine?
In most cases yes: GOST frame sizes correspond to IEC frames, and mounting arrangements use the same IM code system. Send the frame size, shaft height and mounting code of the existing machine; the supplier returns a dimension sheet for direct comparison so your fitters confirm bolt-down compatibility before ordering.
What replaces a failed motor in an old Soviet-built plant?
Often the same series, still in production or manufactured as a direct successor. Provide the nameplate data — series, frame, power, speed — and suppliers identify the current equivalent. This is a routine request from factories in Central Asia, Africa, the Middle East and Cuba operating legacy equipment, and it avoids costly re-engineering of mounts and couplings.
How are large generators and turbogenerators inspected before shipment?
Large machines undergo factory acceptance testing against the contract programme: winding resistance, insulation, no-load and, where facilities allow, load runs. Buyers or their inspectors may witness tests in person or by video. Reports, preservation procedures and transport bracing are documented, and supervision of installation can be contracted separately.
What lead times apply for motors and valve actuators?
Small and medium asynchronous motors of popular ratings ship from stock or within 2–4 weeks. Special windings, high voltage machines and explosion-proof versions take 8–16 weeks. Valve actuators typically run 4–8 weeks including factory setting to your valve data. Sea freight adds 25–45 days depending on destination.