产品 — 电源与配电

Lead Acid Starter Battery 6CT-200N for Automotive Applications

Lead Acid Starter Battery 6CT-200N for Automotive Applications

¥108-345.60
AKTECH ENERGY TRADE LLC 🇷🇺
Lead Acid Starter Battery 6ST-60NC(N) for Vehicles

Lead Acid Starter Battery 6ST-60NC(N) for Vehicles

¥108-302.40
AKTECH ENERGY TRADE LLC 🇷🇺
Lead-Acid Battery 6ST-38 (L, VL, EFB, VRLA, C)

Lead-Acid Battery 6ST-38 (L, VL, EFB, VRLA, C)

¥108-302.40
ELAB LLC 🇷🇺
TUBOR EFB 6СТ-225.3(4) VL Lead-Acid Starter Battery

TUBOR EFB 6СТ-225.3(4) VL Lead-Acid Starter Battery

¥259.20-691.20
TUBOR LLC 🇷🇺
Lead-Acid Starter Battery 6ST-90VL ACOM Euro

Lead-Acid Starter Battery 6ST-90VL ACOM Euro

¥259.20-691.20
AKOM OJSC 🇷🇺
SPARTA High Energy Euro 6ST-63VL 12V Starter Battery

SPARTA High Energy Euro 6ST-63VL 12V Starter Battery

¥194.40-518.40
AKOM OJSC 🇷🇺
TUBOR STANDART 6ST-190.3 VL B00 Lead-Acid Starter Battery

TUBOR STANDART 6ST-190.3 VL B00 Lead-Acid Starter Battery

¥108-302.40
TUBOR LLC 🇷🇺
TUBOR STANDART 6ST-100.1(0) VL Lead-Acid Starter Battery

TUBOR STANDART 6ST-100.1(0) VL Lead-Acid Starter Battery

¥108-302.40
TUBOR LLC 🇷🇺
12V Lead-Acid Starter Battery 6ST-74VL Akom LB Euro

12V Lead-Acid Starter Battery 6ST-74VL Akom LB Euro

¥216-604.80
AKOM OJSC 🇷🇺
Lead-Acid Starter Battery 6ST-74VL SPARTA Energy Euro LB

Lead-Acid Starter Battery 6ST-74VL SPARTA Energy Euro LB

¥151.20-388.80
AKOM OJSC 🇷🇺
Lithium-Ion Battery ICGP6.7/135/150 for Standalone Power Supply

Lithium-Ion Battery ICGP6.7/135/150 for Standalone Power Supply

¥64.80-259.20
URALELEMENT OJSC 🇷🇺
High-Capacity Lithium-Ion Battery ICP7/135/150

High-Capacity Lithium-Ion Battery ICP7/135/150

¥64.80-216
URALELEMENT OJSC 🇷🇺
Premium EFB Lead-Acid Starter Battery 6ST-65VL STALWART

Premium EFB Lead-Acid Starter Battery 6ST-65VL STALWART

¥216-604.80
AKOM OJSC 🇷🇺
Starter Lead-Acid Battery 6СТ-95N(NR) 12V 95Ah

Starter Lead-Acid Battery 6СТ-95N(NR) 12V 95Ah

¥108-302.40
KAZ LLC 🇷🇺
FORA Lead Acid Starter Battery 12V 77Ah

FORA Lead Acid Starter Battery 12V 77Ah

¥151.20-388.80
TANGSTONE LLC 🇷🇺
Cylindrical Lithium-Ion Battery LITZ-2.5E

Cylindrical Lithium-Ion Battery LITZ-2.5E

¥10.80-34.56
URALELEMENT OJSC 🇷🇺
Lead Acid Starter Battery 6СТ-77NC(N), L, LY, VL, EFB

Lead Acid Starter Battery 6СТ-77NC(N), L, LY, VL, EFB

¥108-302.40
AKTEX LLC 🇷🇺
Block-type Distribution Transformer Substation (RTPB) 2500 kVA

Block-type Distribution Transformer Substation (RTPB) 2500 kVA

¥108,000-432,000
TRANSFORMER URAL LLC 🇷🇺
Block-Complete Transformer Substation 2BKTPA-SGA-1600/10/0.4-DC1-UHL1

Block-Complete Transformer Substation 2BKTPA-SGA-1600/10/0.4-DC1-UHL1

¥108,000-432,000
PJSC GAZPROM AUTOMATION 🇷🇺
Block Complete Transformer Substation (BCTP) 100-5000 kVA

Block Complete Transformer Substation (BCTP) 100-5000 kVA

¥108,000-864,000
PROMTEC LLC 🇷🇺
Complete Transformer Substations Power 25-2500 kVA

Complete Transformer Substations Power 25-2500 kVA

¥64,800-1,296,000
SIBKOMPLEKT LLC 🇷🇺
Complete Transformer Substation BKTP 160-2500 kVA

Complete Transformer Substation BKTP 160-2500 kVA

¥64,800-864,000
SEMZ LLC 🇷🇺
Complete Workshop Transformer Substations for Industrial Use

Complete Workshop Transformer Substations for Industrial Use

¥64,800-432,000
ENERGOMASHSERVICE LLC 🇷🇺
Complete Transformer Substations for Voltage Conversion

Complete Transformer Substations for Voltage Conversion

¥21,600-432,000
TERRAVATT LLC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.