产品 — 电源与配电

Complete Outdoor Transformer Substation 25-3200 kVA up to 10 kV

Complete Outdoor Transformer Substation 25-3200 kVA up to 10 kV

¥64,800-1,296,000
Elektrosila LLC 🇷🇺
Block Transformer Substation Complete (KTPB)

Block Transformer Substation Complete (KTPB)

¥64,800-1,296,000
HIGHTEK GROUP LLC 🇷🇺
Complete Transformer Substations (KTP) 6-2500 kVA, 6(10)/0.4 kV

Complete Transformer Substations (KTP) 6-2500 kVA, 6(10)/0.4 kV

¥64,800-1,296,000
ENERGOREGION ETZ LLC 🇷🇺
Complete Transformer Substations in Concrete Enclosure (BKTP)

Complete Transformer Substations in Concrete Enclosure (BKTP)

¥64,800-302,400
ENERGOMASHSERVICE LLC 🇷🇺
Complete Transformer Substation KTPB 6-35kV up to 2500kVA

Complete Transformer Substation KTPB 6-35kV up to 2500kVA

¥64,800-302,400
TRANSFORMER URAL LLC 🇷🇺
Complete Transformer Substations KTP-ELM up to 2500 kVA, 35 kV

Complete Transformer Substations KTP-ELM up to 2500 kVA, 35 kV

¥108,000-604,800
ELEKTRONMASH OJSC 🇷🇺
Complete Transformer Substation 2KTPV 6-2500 kVA 6(10)/0.4 kV

Complete Transformer Substation 2KTPV 6-2500 kVA 6(10)/0.4 kV

¥64,800-1,296,000
ENERGOREGION ETZ LLC 🇷🇺
Complete Transformer Substations up to 2500 kVA 20 kV KTP Type

Complete Transformer Substations up to 2500 kVA 20 kV KTP Type

¥64,800-432,000
ELPROKOM LLC 🇷🇺
Complete Transformer Substations up to 2500 kVA for Voltage up to 10 kV

Complete Transformer Substations up to 2500 kVA for Voltage up to 10 kV

¥129,600-864,000
TITAN ENGINEERING LLC 🇷🇺
Complete Transformer Substations 25-2500 kVA, 10 kV, 2KTPA-400/10/0.4-U3

Complete Transformer Substations 25-2500 kVA, 10 kV, 2KTPA-400/10/0.4-U3

¥64,800-1,296,000
ELECTRO PULSE OJSC 🇷🇺
Complete Block Transformer Substations (BKTP)

Complete Block Transformer Substations (BKTP)

¥108,000-864,000
KRUS-WEST LLC 🇷🇺

Complete Transformer Substations 35 (10.6) / 0.66 (0.4, 0.23) kV

¥216,000-4,320,000
VOLMAG CJSC 🇷🇺
Complete Pole-Mounted Transformer Substations 25-250 kVA

Complete Pole-Mounted Transformer Substations 25-250 kVA

¥15,120-129,600
ENERGOMERA OJSC 🇷🇺
Complete Transformer Substations 10(6)/0.4 kV, 25-2500 kVA

Complete Transformer Substations 10(6)/0.4 kV, 25-2500 kVA

¥34,560-216,000
SETI-MAKS LLC 🇷🇺
Block Complete Transformer Substation Type BKTP

Block Complete Transformer Substation Type BKTP

¥64,800-259,200
ESKONT LLC 🇷🇺
Complete Block Transformer Substations for 35 and 110 kV

Complete Block Transformer Substations for 35 and 110 kV

¥648,000-3,456,000
CHEAZ OJSC 🇷🇺
Complete Transformer Substations from 16 to 6300 kVA

Complete Transformer Substations from 16 to 6300 kVA

¥43,200-864,000
CHEAZ OJSC 🇷🇺
Concrete Frame Transformer Substation BCTP 6-10kV

Concrete Frame Transformer Substation BCTP 6-10kV

¥64,800-259,200
NEZ LLC 🇷🇺
Complete Outdoor Transformer Substation 25kVA to 3150kVA

Complete Outdoor Transformer Substation 25kVA to 3150kVA

¥64,800-432,000
KCK LLC 🇷🇺
Complete Block Transformer Substation KTPB-E

Complete Block Transformer Substation KTPB-E

¥648,000-12,960,000
ENERGOSTAR LLC 🇷🇺
Complete Transformer Substation KTPS, 25-250 kVA, 6(10)/0.4 kV

Complete Transformer Substation KTPS, 25-250 kVA, 6(10)/0.4 kV

¥12,960-129,600
220 VOLT LLC 🇷🇺
Complete Transformer Substation KTPB 110 for Outdoor Installation

Complete Transformer Substation KTPB 110 for Outdoor Installation

¥648,000-2,592,000
CHEAZ OJSC 🇷🇺
Complete Transformer Substation (KTP)

Complete Transformer Substation (KTP)

¥64,800-864,000
PROMTEC LLC 🇷🇺
Complete Transformer Substation KTP TU 3434-011-33874352-2009

Complete Transformer Substation KTP TU 3434-011-33874352-2009

¥21,600-129,600
KazanElektroshchit LLC 🇷🇺
Complete Transformer Substation KTPN Type

Complete Transformer Substation KTPN Type

¥64,800-259,200
ESKONT LLC 🇷🇺
KTP-Smart Transformer 6(10)/0.4kV

KTP-Smart Transformer 6(10)/0.4kV

¥64,800-216,000
ZETZ LLC 🇷🇺
Complete Transformer Substation for Industrial Power Supply

Complete Transformer Substation for Industrial Power Supply

¥64,800-432,000
ENERGOCAPITAL LLC 🇷🇺

Complete Transformer Substation KTPB(M) 110kV

¥1,080,000-4,320,000
IZVA LLC 🇷🇺
Block-type Distribution Transformer Substation (RTPB)

Block-type Distribution Transformer Substation (RTPB)

¥108,000-1,296,000
HIGHTEK GROUP LLC 🇷🇺
Complete Transformer Substation KTP-VV (VK)-1-25-10(6)/0.4-UXL1

Complete Transformer Substation KTP-VV (VK)-1-25-10(6)/0.4-UXL1

¥6,480-25,920
Alttras OJSC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.