产品 — 锅炉与燃烧器
Electric Cooking Kettle with Mixing and Cooling Functions KPEM-100-OMP-VK
¥64,800-216,000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Electric Cooking Kettle with Stirring and Cooling Functions KPEM-160-OMP
¥64,800-216,000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Aluminum Camping Pot 3L (Uncoated) with Lid - Kukmara
¥34.56-129.60
KUKMORA METALLIC WARE PLANT OJSC 🇷🇺
Electric Cooking Kettle KPEM-250-OMP for Soups and Sauces
¥64,800-216,000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Electric Cooking Kettle with Mixing and Cooling Functions KPEM-100-OM2-VK
¥34,560-108,000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Monoblock Level Indicator for Boiler Drums and Vessels TE-29BSM DN 20 P6.4 MPa, H=320, t350
¥6,480-21,600
ENERGOMASH-ENGINEERING LLC 🇷🇺
Electric Cooking Kettle with Mixing and Cooling KPEM-60-OMP
¥25,920-108,000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Aluminum Camp Pot 4.5L (Uncoated) with Aluminum Lid - Kukmara
¥43.20-158.40
KUKMORA METALLIC WARE PLANT OJSC 🇷🇺
发布您的采购需求
从认证供应商获取报价
节省时间
Aluminum Camp Pot 40L (Uncoated) with Aluminum Lid - Kukmara
¥108-302.40
KUKMORA METALLIC WARE PLANT OJSC 🇷🇺
Electric Cooking Boiler with Mixing and Cooling Functions KPEM-350-OM2-V
¥25,920-69,120
CHUVASHTORGTECHNICA OJSC 🇷🇺
Electric Cooking Boiler with Stirring and Cooling Functions KPEM-100-OMP-V
¥64,800-216,000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Electric Cooking Boiler with Mixing and Cooling Functions KPEM-160-OMP-VK
¥64,800-216,000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Electric Cooking Kettle with Mixing and Cooling Functions, KPEM-160-OM2-V
¥34,560-108,000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Cooking Apparatus ZCA, Capacity 50-50000 liters (0.05-50 m³)
¥64,800-4,320,000
UralSpetsTrans LLC 🇷🇺
Electric Cooking Boiler KPEM-60-OMP-V for Soups and Sauces
¥30,240-108,000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Electric Cooking Kettle with Mixing and Cooling Functions, KPEM-200-OM2
¥30,240-108,000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Syrup Cooking Pot for Making Syrups, Honey, and Sweet Products
¥15,120-60,480
Pischevik Engineering LLC 🇷🇺
Aluminum Camping Pot 10L (Uncoated) with Lid - Kukmara
¥64.80-216
KUKMORA METALLIC WARE PLANT OJSC 🇷🇺
20L Aluminum Camping Pot (Uncoated, with Aluminum Lid) - Kukmara
¥64.80-216
KUKMORA METALLIC WARE PLANT OJSC 🇷🇺
Electric Cooking Boiler with Mixing and Cooling Functions KPEM-60-OMP-VK
¥43,200-129,600
CHUVASHTORGTECHNICA OJSC 🇷🇺
Automated Cleaning Equipment for Convective Heat Surfaces 221ЭОБ000
¥302,400-1,080,000
KRASMASH OJSC 🇷🇺
Sanitary Technical Services, Heating Systems & Air Conditioning Installation
¥21,600-432,000
MKMS LLC 🇷🇺
Flanged Sea Water Filter Made of Non-Ferrous Alloy DN 250, PN 0.4 MPa ITSHL.061144.008-01
¥6,480-21,600
ARMALIT OJSC 🇷🇺
常见问题
•Can burners be configured for our local fuel quality?
Yes — fuel adaptation is a standard engineering request. Provide your gas pressure range or diesel specification and the factory selects jets, pumps and control settings accordingly. Dual-fuel burners that switch between gas and liquid fuel are widely produced and popular in markets with unstable gas supply.
•Who performs commissioning of a boiler or heat substation?
Smaller boilers are commissioned by your local heating contractor using the supplied manuals and schematics. For industrial boilers and packaged substations, manufacturers typically offer supervised commissioning: either a factory engineer travels to site for an agreed fee, or commissioning is guided remotely with a checklist and video support.
•What documentation is provided for project approval?
Standard sets include the technical passport, EAC declaration, hydraulic test certificate, burner adjustment records, and installation and operation manuals. For tender projects, suppliers can additionally provide dimensional drawings, electrical schematics and efficiency data sheets in English.
•How long does manufacturing and delivery take?
Catalogue burners and wall boilers often ship from stock within 2 to 3 weeks. Floor-standing industrial boilers and packaged heat substations are built to order, typically in 45 to 90 days depending on capacity, plus sea or overland transit. Trucking to Central Asia is usually faster than sea routes.
•Are spare parts a risk with imported boilers?
Boiler plants address this with recommended two-year spare kits — gaskets, electrodes, sensors, control boards — shipped with the equipment. Most wear parts are standardised, and consumables such as nozzles and ignition electrodes are also available from third-party suppliers, which reduces dependence on a single source.