Товары — Электропитание и распределение

OLS Series Power Transformers with Cast Insulation

Силовые трансформаторы ОЛС

₽150 000-500 000
ОАО "СЗТТ" 🇷🇺
Oil Power Transformer TMG-250 for Energy Sector

Трансформатор силвой, масляной ТМГ-250

₽700 000-1 200 000
АО "КОНЦЕРН КЭМЗ" 🇷🇺
Current Measuring Transformer TT39P 0.66 kV

ТТ07.100000.000 Трансформатор ТТ39П

₽1 500-2 500
ООО "НПК "АВТОПРИБОР" 🇷🇺
Power Transformers OL-0.3/35 for Domestic and Export Use

Силовые трансформаторы ОЛ-0,3/35

₽150 000-300 000
ОАО "СЗТТ" 🇷🇺
OL-NTZ Single-Phase Power Transformer for Outdoor Installation

Трансформатор силовой ОЛ-НТЗ

₽25 000-45 000
ООО "НТЗ" ВОЛХОВ" 🇷🇺
Power Transformers OL-1/10 for Dielectric Loss Measurement

Силовые трансформаторы ОЛ-1/10

₽15 000-30 000
ОАО "СЗТТ" 🇷🇺
Power Transformers OL Series - Efficient Outdoor Solutions

Силовые трансформаторы ОЛ

₽150 000-300 000
ОАО "СЗТТ" 🇷🇺
Transformer 1TR.071 for Electric Train Equipment

Трансформатор 1ТР.071

₽25 000-40 000
ООО "ГРАВИТОН" 🇷🇺
Three-Phase Oil Power Transformer TRDCN-63000/110

Трехфазный масляный силовой трансформатор ТРДЦН-63000/110

₽15 000 000-25 000 000
ООО "ВОРОНЕЖСКИЙ ТРАНСФОРМАТОР" 🇷🇺
Dry Power Transformer TSZR-10/0.4 UHL3 for General Use

Трансформатор силовой сухой, тип ТСЗР-10/0,4 УХЛ3

₽250 000-400 000
ООО "ЭЛЕКТРОФИЗИКА" 🇷🇺
Uninterruptible Power Supply ATS 1500 R-E

Источник бесперебойного питания ATS 1500 R-E

₽60 000-100 000
ООО "АТС-КОНВЕРС" 🇷🇺
Three-Phase Oil Power Transformer TD-63000/330

Трехфазный масляный силовой трансформатор ТД-63000/330

₽15 000 000-25 000 000
ООО "ВОРОНЕЖСКИЙ ТРАНСФОРМАТОР" 🇷🇺
Three-Phase Oil Power Transformer TMN-10000/10

Трехфазный масляный силовой трансформатор ТМН-10000/10

₽7 000 000-12 000 000
ООО "ВОРОНЕЖСКИЙ ТРАНСФОРМАТОР" 🇷🇺
Three-Phase Reducing Power Transformer TMG-AP-630

Трансформатор ТМГ-АП-630

₽1 500 000-2 500 000
ООО "НПК "АВТОПРИБОР" 🇷🇺
Sine-Cosine Contact Transformer SKT-220-1P with Technical Conditions

Трансформатор контактный синусно-косинусный СКТ-220-1П с.2 ОАО "У-У ППО" Россия

₽500-1 500
Акционерное общество "Улан-Удэнское приборостроительное 🇷🇺
Isolating Transformer for Airport Lighting Connection

Трансформатор изолирующий

₽15 000-30 000
АО "ГОКБ "ПРОЖЕКТОР" 🇷🇺
Three-Phase Reducing Transformer TMG-AP-250

Трансформатор ТМГ-АП-250

₽1 500 000-2 500 000
ООО "НПК "АВТОПРИБОР" 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.