Power Transformers
Current Transformers (Instrument)
Voltage Transformers (Instrument)
Special Purpose & Choke Transformers
Uninterruptible Power Supplies (UPS)
Voltage Stabilizers
Power Supplies & Power Modules
Inverters, Rectifiers & Battery Chargers
Frequency Converters / VFD
Measurement Transducers (Current, Voltage, Power)
Switchgear & Low-Voltage Distribution Equipment
Packaged Substations
Starter Batteries
Stationary & Lithium-Ion Batteries
Solar Power Plants & PV Modules
Power Supply & DC Backup Systems
Redundant Secondary Power Sources
Industrial Sockets & Power Columns
EV Charging Stations
Other Power Distribution Equipment
产品 — 电源与配电
Three-Phase Dry Power Transformers with Cast Resin Insulation
¥64,800-432,000
PROJECTELECTROTECHNICS LLC 🇷🇺
Dry Power Transformer with Cast Insulation 1000 kVA, up to 10 kV, Type TSZ
¥64,800-216,000
NTT-IK LLC 🇷🇺
Automated Transformer Monitoring and Diagnostics System "NEVA-ASKDT
¥64,800-259,200
Energosoyuz CJSC 🇷🇺
400 kVA Dry Power Transformer with Cast Resin Insulation, Model TSZ-400/10-U3
¥30,240-108,000
NTT-IK LLC 🇷🇺
3150 kVA Oil-Immersed Distribution Transformer TMG-SESH for up to 35 kV
¥64,800-216,000
ELECTROSHIT Group OJSC - SAMARA TM 🇷🇺
Three-Phase Oil-Filled Dual-Winding Transformer TDC-160000/110-10.5
¥864,000-3,456,000
ELMAS (UETM) LLC 🇷🇺
Oil-Powered Distribution Transformer Series OMG-25-10(6)/0.23 (Pole-Mounted)
¥6,480-21,600
Alttras OJSC 🇷🇺
Three-Phase Dry Power Transformers with Cast Insulation (TSL) up to 3150 kVA
¥64,800-864,000
EP-A LLC 🇷🇺
General Purpose Oil Distribution Transformers TMGF Series 400-630 kVA
¥21,600-129,600
Alttras OJSC 🇷🇺
Three-Phase Dry Power Transformers with Air Barrier Insulation, 500-4000 kVA
¥43,200-432,000
KPM LLC 🇷🇺
SKAT-UPS 3000 Online Uninterruptible Power Supply Rack with 6x9Ah Batteries
¥1,944-5,616
BASTION CJSC 🇷🇺
Dry Power Transformer with Cast Insulation, 1000 kVA, up to 10 kV, TS Type
¥30,240-108,000
NTT-IK LLC 🇷🇺
Oil-Filled Transformer TDP Series 12500 and 16000 kVA
¥648,000-2,160,000
SVEL-POWER TRANSFORMERS LLC 🇷🇺
Sine-Cosine Contact Transformer SKT-220-1P with Technical Conditions
¥21.60-129.60
Ulan-Ude Instrument-Making OJSC 🇷🇺
常见问题
•Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
•What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
•How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
•Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
•Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
•What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.