Товары — Электропитание и распределение

Floor-standing Uninterruptible Power Supply 20kVA SIP380A20BD.9-33

ИБП СИП380А20БД.9-33

₽350 000-500 000
ООО "ПАРУС ЭЛЕКТРО" 🇷🇺
RAPAN-100 Uninterruptible Power Supply V.8

Блок бесперебойного питания RAPAN-100 исп.V.8

₽15 000-25 000
ЗАО "БАСТИОН" 🇷🇺
Uninterruptible Power Supply PS12-2.5-12 for Fire Safety Systems

PS12-2.5-12 Блок бесперебойного электропитания

₽6 000-10 000
ООО "НИТП НИТА" 🇷🇺
Modular Double Conversion UPS SIP380A200MD20.09-33

ИБП СИП380А200МД20.09-33

₽1 500 000-2 500 000
ООО "ПАРУС ЭЛЕКТРО" 🇷🇺
Three-Phase Uninterruptible Power Supply IDP-3-3/3-20-380-C

Источник бесперебойного питания ИДП-3-3/3-20-380-С

₽1 500 000-2 500 000
АО "ЭЛЕКТРОМАШ" 🇷🇺
Linear Interactive UPS SIPB1.2BA.6-11/LI

ИБП СИПБ1,2БА.6-11/ЛИ

₽7 000-12 000
ООО "ПАРУС ЭЛЕКТРО" 🇷🇺
Uninterruptible Power Supply PS24-1.3-12

PS24-1.3-12 Блок бесперебойного электропитания

₽15 000-25 000
ООО "НИТП НИТА" 🇷🇺
Online UPS SIPB1BA.10-11 with Built-in Batteries

ИБП СИПБ1БА.10-11

₽45 000-60 000
ООО "ПАРУС ЭЛЕКТРО" 🇷🇺
Uninterruptible Power Supply BPP 24-18-380

Блок бесперебойного питания ББП 24-18-380

₽45 000-70 000
ООО "УРАЛТЕХИС" 🇷🇺
Uninterruptible Power Supply (UPS) SIPB1KA.9-11

ИБП СИПБ1КА.9-11

₽35 000-50 000
ООО "ПАРУС ЭЛЕКТРО" 🇷🇺
K-307-10 Uninterruptible Power Supply for Telecommunications

Источник бесперебойного питания К-307-10

₽15 000-25 000
ООО "НПП СИГМА" 🇷🇺
Uninterruptible Power Supply System SBP-1-400-50-UHL4

Системы бесперебойного питания СБП-1-400-50-УХЛ4

₽500 000-1 500 000
АО "ЗАВОД "ИНВЕРТОР" 🇷🇺
Uninterruptible Power Supply Skat-2412

Источник бесперебойного питания СКАТ-2412

₽15 000-25 000
ЗАО "БАСТИОН" 🇷🇺
PitON RT Series 10 kVA Uninterruptible Power Supply (UPS)

ИБП PitON РТ-Серии 10 кВА

₽250 000-350 000
ООО "ПИТОН КАМА" 🇷🇺
Intelligent UPS Impulse Master 850 for Reliable Power Backup

ИБП ИМПУЛЬС МАСТЕР 850

₽10 000-15 000
ООО "СИСТЕМОТЕХНИКА" 🇷🇺

Источники бесперебойного питания

₽500 000-5 000 000
ООО "ЛИОТЕХ-ИННОВАЦИИ" 🇷🇺
K-207-50 Uninterruptible Power Supply for Communication Equipment

Источник бесперебойного питания К-207-50

₽15 000-25 000
ООО "НПП СИГМА" 🇷🇺
Uninterruptible Power Supply BBP RAPAN-10

Блок бесперебойного питания ББП РАПАН-10

₽2 500-4 000
ЗАО "БАСТИОН" 🇷🇺
Uninterruptible Power Supply SKAT-1200 for Dual Battery Operation

Источник бесперебойного питания СКАТ-1200

₽15 000-25 000
ЗАО "БАСТИОН" 🇷🇺
Floor-mounted Uninterruptible Power Supply 200kVA SIP380A200BD.9-33

ИБП СИП380А200БД.9-33

₽2 500 000-3 500 000
ООО "ПАРУС ЭЛЕКТРО" 🇷🇺
Uninterruptible Power Supply for Security Systems - BBP-50M

ББП-50 М блок бесперебойного питания

₽3 500-5 000
ООО "СИБАЛЬЯНС" 🇷🇺
Modular Double Conversion UPS SIP380A150MD12.10-33/50

ИБП СИП380А150МД12.10-33/50

₽250 000-400 000
ООО "ПАРУС ЭЛЕКТРО" 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.