Товары — Электропитание и распределение

Combined Power Supply BPK-5M

Блок питания комбинированный БПК-5М

₽25 000-45 000
ООО "НТЦ "МЕХАНОТРОНИКА" 🇷🇺
Power Supply Module for Industrial Automation EF A 1AC/48DC-2

Модуль системы электропитания EF A 1AC/48DC-2

₽6 000-12 000
ООО "ЗАВОД ПСА "ЭЛЕСИ" 🇷🇺
Universal DC Power Supply System UWS48-36

СБП типа УВС48-36

₽1 500 000-2 500 000
ООО "ПАРУС ЭЛЕКТРО" 🇷🇺
Power Module ZPU-10P-220 with LED Indicator

Модуль питания ЗПУ-10П-220

₽15 000-25 000
ООО НПП "ЭКРА" 🇷🇺
On-Board Power Supply Source DIP-01K IDBM.435251.008-01

Источник бортового электропитания типа ДИП-01К ИДБМ.435251.008-01

₽150 000-300 000
АО "ЭМЗ"АВАНГАРД-КОНВЕРСИЯ" 🇷🇺
EF Power Supply Module UPS 1AC/24DC-4

Модуль системы электропитания EF A UPS 1AC/24DC-4

₽15 000-25 000
ООО "ЗАВОД ПСА "ЭЛЕСИ" 🇷🇺
Power Supply BPL for Mining Equipment

Блок питания БПЛ

₽25 000-40 000
ООО "УРАЛТЕХИС" 🇷🇺
Power Supply Module EF A UPS 1AC/24DC-16 for Industrial Automation

Модуль системы электропитания EF A UPS 1AC/24DC-16

₽15 000-25 000
ООО "ЗАВОД ПСА "ЭЛЕСИ" 🇷🇺
Diver Water Heating System UVO-2

Установка водообогрева водолазов УВО-2

₽800 000-1 200 000
АО "ТЕТИС ПРО" 🇷🇺
Stabilizing Power Module SMV3AA

Модуль питания стабилизирующие СМВ3АА

₽1 500-3 000
ООО "ММП-ИРБИС" 🇷🇺
Automatic Power Switching Panels for Marine Systems

Щиты переключения питания автоматические

₽150 000-300 000
АО "ВНИИР-ПРОГРЕСС" 🇷🇺
Power Supply Unit for Various Applications - PS-4536

PS-4536 Источник питания

₽2 500-4 000
НИЛ АП, ООО 🇷🇺
12V Power Supply Unit BP-12/0.5 Type L

Блок питания БП-12/0,5 исп. Л

₽5 000-8 000
ООО "АРГУС-СПЕКТР" 🇷🇺
Power Supply Box for Own Needs - ЯСН

ЯСН – ящик собственных нужд

₽15 000-30 000
ООО "ПРОИЗВОДСТВЕННАЯ КОМПАНИЯ ЭНЭЛТ" 🇷🇺
DC Voltage Source B5-88/2 for Stable Power Supply

Источник напряжения постоянного тока Б5-88/2

₽25 000-40 000
ООО "РИП-Импульс" 🇷🇺
EF Power Supply Module 24DC/24DC-4 for Industrial Automation

Модуль системы электропитания EF А 24DC/24DC-4

₽15 000-25 000
ООО "ЗАВОД ПСА "ЭЛЕСИ" 🇷🇺
High Voltage Power Supply HVULP Series

Высоковольтный источник питания HVULP

₽1 500-5 000
ООО "ПАРАМЕРУС" 🇷🇺
Three-Phase Static Converter PTS-200B

ПТС-200В Преобразователь трехфазный статический

₽50 000-100 000
АО "НПО "ЭЛЕКТРОМАШИНА" 🇷🇺
DC Power Supply B5-79/1 for Electronic Devices

Источник постоянного тока Б5-79/1

₽25 000-40 000
АО "НПФ "ТЕХНОЯКС" 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.