Товары — Электропитание и распределение

Three-Phase Thyristor Rectifier B-TPE-160(200)-230(320)-UHL5

Выпрямитель В-ТПЕ-160(200)-230(320)-УХЛ5

₽700 000-1 200 000
АО "ЗАВОД "ИНВЕРТОР" 🇷🇺
Three-Phase Voltage Converter AE3855 for Electrical Measurement

Преобразователь напряжения трехфазного тока измерительный АЕ3855

₽15 000-25 000
ООО "ФИРМА "АЛЕКТО-ЭЛЕКТРОНИКС" 🇷🇺
AC Power Inverter BFI Converter

Преобразователь (инвертор) BFI

₽300 000-1 500 000
ООО "АПС ЭНЕРГИЯ РУС" 🇷🇺
Signal Rectifier V-OPE-TM-1(2) for Underground Pipeline Protection

Выпрямитель «Сигнал» В-ОПЕ-ТМ-1(2)

₽150 000-750 000
ПАО"СИГНАЛ" 🇷🇺
ZU-2-4A(50) Battery Charger - Efficient Charging Solution

Зарядное устройство ЗУ-2-4А(50)

₽30 000-60 000
ООО "КОМЕТА-С" 🇷🇺
Autonomous Power Supply AIP-400-28-GTEG-200/2

Автономный источник питания АИП-400-28-ГТЭГ-200/2

₽7 000 000-12 000 000
ООО ЗАВОД "САРАТОВГАЗАВТОМАТИКА" 🇷🇺
Modular Inverter IM 2500/220 for Power Supply

Инвертор модульный ИМ 2500/220

₽150 000-250 000
АО «НПК ВИП» 🇷🇺
ZPU-10P Rechargeable Power Supply for DC Devices

Устройство зарядное подзарядное ЗПУ - 10П

₽25 000-40 000
ООО НПП "ЭКРА" 🇷🇺
AC/DC Converter IP2500D-110 for Efficient Power Conversion

AC/DC преобразователь ИП2500Д-110

₽15 000-25 000
ООО "ММП-ИРБИС" 🇷🇺
Voltage Converter PN-12000-28.5-00

Преобразователь напряжения ПН-12000-28,5-00

₽150 000-300 000
ООО СКТБ "СКИТ" 🇷🇺
Urban Transport Network Voltage Converter PKC-600/220-5

Преобразователь контактной сети ПКС-600/220-5

₽75 000-120 000
ООО "ТД АРС ТЕРМ" 🇷🇺
Voltage Inverter INK2500-1S

Инвертор напряжения ИНК2500-1С

₽70 000-120 000
ООО "ММП-ИРБИС" 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.