Products — Boilers & Burners

Warta WHC-1500 Electric Convector Heater

Warta WHC-1500 Electric Convector Heater

$15-48
IZTT LLC 🇷🇺
KALASHNIKOV Infrared Heater KIRH-E06P-11

KALASHNIKOV Infrared Heater KIRH-E06P-11

$15-48
IZTT LLC 🇷🇺
Wall-Mounted Kitchen Exhaust Hood ZVPk Series

Wall-Mounted Kitchen Exhaust Hood ZVPk Series

$210-840
TECHNOLOGIES OF THE SOUTH LLC 🇷🇺
Roller Table for Dishwasher, SRPM Model

Roller Table for Dishwasher, SRPM Model

$150-840
REST METALL LLC 🇷🇺
Corrosion and Deposit Inhibitor Novamin 906H

Corrosion and Deposit Inhibitor Novamin 906H

$9-60
Helamin Project LLC 🇷🇺
VA Type Stand for Combi Ovens and Equipment

VA Type Stand for Combi Ovens and Equipment

$150-840
SPECMASH LLC 🇷🇺
Support Stand for Stoves, Type PP

Support Stand for Stoves, Type PP

$15-60
PROMASH OJSC 🇷🇺
High Pressure Water Heater PV-250-180-21

High Pressure Water Heater PV-250-180-21

$9,000-36,000
SUZMK ENERGO OJSC 🇷🇺
Gas Stove PRG-IIA-8-1 2DSh "Maxi

Gas Stove PRG-IIA-8-1 2DSh "Maxi

$2,100-6,000
KELER RUS LLC 🇷🇺
Liquid Heater Pramotronic STREAM 160

Liquid Heater Pramotronic STREAM 160

$150-480
ELTRA-TERMO OJSC 🇷🇺
Heating Block TB-3.2MA for Drying Applications

Heating Block TB-3.2MA for Drying Applications

$1,500-4,800
AGROPROMTECHNICA CJSC 🇷🇺
Gas Air Heater-Destratifier SA10025DT

Gas Air Heater-Destratifier SA10025DT

$1,500-4,800
Sibshvank OJSC 🇷🇺
High-Pressure Water Heater PVD-500-23-2.0

High-Pressure Water Heater PVD-500-23-2.0

$9,000-36,000
SUZMK ENERGO OJSC 🇷🇺
Electric Convector Heater MP-2000.2 for Efficient Heating

Electric Convector Heater MP-2000.2 for Efficient Heating

$15-48
REMO-TECHNOLOGIES LLC 🇷🇺
Stainless Steel Cleaning Sink VMC-C

Stainless Steel Cleaning Sink VMC-C

$90-540
Food Machinery Plant LLC 🇷🇺
Standard Seamless Washing Bath VMOc1-500SNK

Standard Seamless Washing Bath VMOc1-500SNK

$150-420
PISHTEKH LLC 🇷🇺
TSHG-8 Spindle Trolley for Food Service Operations

TSHG-8 Spindle Trolley for Food Service Operations

$150-540
CHUVASHTORGTECHNICA OJSC 🇷🇺
Stainless Steel Washing Sink VSM-3

Stainless Steel Washing Sink VSM-3

$210-660
BLOCK OJSC 🇷🇺
Electric Infrared Heater VI500MW

Electric Infrared Heater VI500MW

$15-48
REMO-TECHNOLOGIES LLC 🇷🇺
Infrared Heater Royal Thermo RTI-20

Infrared Heater Royal Thermo RTI-20

$21-60
IZTT LLC 🇷🇺
Gas Air Heater for Efficient Heating and Drying TAH-300

Gas Air Heater for Efficient Heating and Drying TAH-300

$1,500-4,800
IEMZ Kupol OJSC 🇷🇺

Gas Boilers and Industrial Burners from a Country Built on District Heating

Russia heats entire cities through centralised boiler houses, and that engineering school is visible across these 339 listings from 113 suppliers. The category spans gas burners (51 positions), floor-standing gas boilers (23), hot water boilers for commercial and municipal use (15), wall-mounted boilers, diesel and oil burners, and complete heat substations with integrated controls (12). This is equipment for buyers who think in megawatts and heating seasons, not just apartments.

The competitive case is practical. Russian boiler plants build for −40 °C winters, fluctuating gas pressure and long maintenance intervals, then price the result noticeably below European equivalents. Burners are commonly available in dual-fuel configurations — useful in markets where gas supply is intermittent and diesel backup is mandatory for hospitals, hotels and factories.

  • Burners: gas, diesel, oil and combination units across a wide output range
  • Boilers: wall-mounted units through floor-standing and industrial hot water boilers
  • Heat substations: packaged skids with pumps, exchangers and automation
  • Compliance: EAC conformity, GOST-based technical passports, test certificates
  • Shipping: EXW or FOB; large boilers travel as crated sea cargo, substations as skids

Specify your fuel, required output and water temperatures in a sourcing request, and boiler plants will come back with sized proposals rather than generic price lists.

FAQ

Can burners be configured for our local fuel quality?
Yes — fuel adaptation is a standard engineering request. Provide your gas pressure range or diesel specification and the factory selects jets, pumps and control settings accordingly. Dual-fuel burners that switch between gas and liquid fuel are widely produced and popular in markets with unstable gas supply.
Who performs commissioning of a boiler or heat substation?
Smaller boilers are commissioned by your local heating contractor using the supplied manuals and schematics. For industrial boilers and packaged substations, manufacturers typically offer supervised commissioning: either a factory engineer travels to site for an agreed fee, or commissioning is guided remotely with a checklist and video support.
What documentation is provided for project approval?
Standard sets include the technical passport, EAC declaration, hydraulic test certificate, burner adjustment records, and installation and operation manuals. For tender projects, suppliers can additionally provide dimensional drawings, electrical schematics and efficiency data sheets in English.
How long does manufacturing and delivery take?
Catalogue burners and wall boilers often ship from stock within 2 to 3 weeks. Floor-standing industrial boilers and packaged heat substations are built to order, typically in 45 to 90 days depending on capacity, plus sea or overland transit. Trucking to Central Asia is usually faster than sea routes.
Are spare parts a risk with imported boilers?
Boiler plants address this with recommended two-year spare kits — gaskets, electrodes, sensors, control boards — shipped with the equipment. Most wear parts are standardised, and consumables such as nozzles and ignition electrodes are also available from third-party suppliers, which reduces dependence on a single source.