Products — Boilers & Burners

Autonomous Thermoplastic Heating Boilers "Gorynych

Autonomous Thermoplastic Heating Boilers "Gorynych

$15,000-42,000
SPECDORTECHNICA LLC 🇷🇺
Electric Dough Proving Cabinet RT-600

Electric Dough Proving Cabinet RT-600

$360-1,100
TULATORGTECHNIKA OJSC 🇷🇺
Stainless Steel Pot Washing Sink VKS-P

Stainless Steel Pot Washing Sink VKS-P

$180-1,800
Food Machinery Plant LLC 🇷🇺
Infrared Heater KALASHNIKOV KIR-P0.6-54

Infrared Heater KALASHNIKOV KIR-P0.6-54

$15-48
IZTT LLC 🇷🇺
Infrared Heater TDM Electric SQ2520-1102

Infrared Heater TDM Electric SQ2520-1102

$21-60
IZTT LLC 🇷🇺
Low Pressure Heater for Steam Turbines - PNG Type

Low Pressure Heater for Steam Turbines - PNG Type

$9,000-180,000
SARENERGOMASH OJSC 🇷🇺
Electric Shashlik Grill ETK-BST5 "Merapi

Electric Shashlik Grill ETK-BST5 "Merapi

$900-3,000
KELER RUS LLC 🇷🇺
Sand Filter FRPS 700 for Liquid Filtration

Sand Filter FRPS 700 for Liquid Filtration

$1,500-4,800
KOROLAN LLC 🇷🇺
Infrared Heater Oasis IR-8

Infrared Heater Oasis IR-8

$21-60
IZTT LLC 🇷🇺
Infrared Electric Heater OIM-1

Infrared Electric Heater OIM-1

$90-300
IEMZ Kupol OJSC 🇷🇺
SEA 80 Hot-Air Aircraft Heater

SEA 80 Hot-Air Aircraft Heater

$15,000-48,000
RTC LLC 🇷🇺
High Pressure Water Heater PVD-810-23-4.5-III

High Pressure Water Heater PVD-810-23-4.5-III

$30,000-120,000
SUZMK ENERGO OJSC 🇷🇺
Tram Interior Heater OST 3.0-550

Tram Interior Heater OST 3.0-550

$900-3,000
TEK LLC 🇷🇺
Infrared Heater "BALLU" BIH-T-2.0-E

Infrared Heater "BALLU" BIH-T-2.0-E

$90-300
IZTT LLC 🇷🇺
Plastic Brine Mixer SRP-3-2.0K

Plastic Brine Mixer SRP-3-2.0K

$900-3,000
SEMZ LLC 🇷🇺
High-Pressure Water Heater PVD 550-23-4.0-II

High-Pressure Water Heater PVD 550-23-4.0-II

$30,000-120,000
SUZMK ENERGO OJSC 🇷🇺
Heating Unit TB-2.5MA for Drying Applications

Heating Unit TB-2.5MA for Drying Applications

$1,500-4,800
AGROPROMTECHNICA CJSC 🇷🇺
Stainless Steel Handwashing Sink VR-500

Stainless Steel Handwashing Sink VR-500

$150-420
Contact OJSC 🇷🇺
Ballu Infrared Heater Model BIH-APL-1.0

Ballu Infrared Heater Model BIH-APL-1.0

$36-96
IZTT LLC 🇷🇺
Gas Air Heater SA10050R - Efficient Climate Control

Gas Air Heater SA10050R - Efficient Climate Control

$900-3,000
Sibshvank OJSC 🇷🇺

Gas Boilers and Industrial Burners from a Country Built on District Heating

Russia heats entire cities through centralised boiler houses, and that engineering school is visible across these 339 listings from 113 suppliers. The category spans gas burners (51 positions), floor-standing gas boilers (23), hot water boilers for commercial and municipal use (15), wall-mounted boilers, diesel and oil burners, and complete heat substations with integrated controls (12). This is equipment for buyers who think in megawatts and heating seasons, not just apartments.

The competitive case is practical. Russian boiler plants build for −40 °C winters, fluctuating gas pressure and long maintenance intervals, then price the result noticeably below European equivalents. Burners are commonly available in dual-fuel configurations — useful in markets where gas supply is intermittent and diesel backup is mandatory for hospitals, hotels and factories.

  • Burners: gas, diesel, oil and combination units across a wide output range
  • Boilers: wall-mounted units through floor-standing and industrial hot water boilers
  • Heat substations: packaged skids with pumps, exchangers and automation
  • Compliance: EAC conformity, GOST-based technical passports, test certificates
  • Shipping: EXW or FOB; large boilers travel as crated sea cargo, substations as skids

Specify your fuel, required output and water temperatures in a sourcing request, and boiler plants will come back with sized proposals rather than generic price lists.

FAQ

Can burners be configured for our local fuel quality?
Yes — fuel adaptation is a standard engineering request. Provide your gas pressure range or diesel specification and the factory selects jets, pumps and control settings accordingly. Dual-fuel burners that switch between gas and liquid fuel are widely produced and popular in markets with unstable gas supply.
Who performs commissioning of a boiler or heat substation?
Smaller boilers are commissioned by your local heating contractor using the supplied manuals and schematics. For industrial boilers and packaged substations, manufacturers typically offer supervised commissioning: either a factory engineer travels to site for an agreed fee, or commissioning is guided remotely with a checklist and video support.
What documentation is provided for project approval?
Standard sets include the technical passport, EAC declaration, hydraulic test certificate, burner adjustment records, and installation and operation manuals. For tender projects, suppliers can additionally provide dimensional drawings, electrical schematics and efficiency data sheets in English.
How long does manufacturing and delivery take?
Catalogue burners and wall boilers often ship from stock within 2 to 3 weeks. Floor-standing industrial boilers and packaged heat substations are built to order, typically in 45 to 90 days depending on capacity, plus sea or overland transit. Trucking to Central Asia is usually faster than sea routes.
Are spare parts a risk with imported boilers?
Boiler plants address this with recommended two-year spare kits — gaskets, electrodes, sensors, control boards — shipped with the equipment. Most wear parts are standardised, and consumables such as nozzles and ignition electrodes are also available from third-party suppliers, which reduces dependence on a single source.