Товарлар — Казандар, күйгүзгүчтөр жана суу жылытуу системалары

Fast Sand Filter for Drinking Water Purification (FRPS)

Fast Sand Filter for Drinking Water Purification (FRPS)

сом 78,300-313,200
KOROLAN LLC 🇷🇺
Warta WHC-1500 Electric Convector Heater

Warta WHC-1500 Electric Convector Heater

сом 1,305-4,176
IZTT LLC 🇷🇺
Infrared Heater for Industrial Use, Model BIH-AP4-0.6-M

Infrared Heater for Industrial Use, Model BIH-AP4-0.6-M

сом 2,349-6,264
IZTT LLC 🇷🇺
KALASHNIKOV Infrared Heater KIRH-E06P-11

KALASHNIKOV Infrared Heater KIRH-E06P-11

сом 1,305-4,176
IZTT LLC 🇷🇺
Wall-Mounted Kitchen Exhaust Hood ZVPk Series

Wall-Mounted Kitchen Exhaust Hood ZVPk Series

сом 18,270-73,080
TECHNOLOGIES OF THE SOUTH LLC 🇷🇺
Roller Table for Dishwasher, SRPM Model

Roller Table for Dishwasher, SRPM Model

сом 13,050-73,080
REST METALL LLC 🇷🇺
Indirect Heating Boiler Royal Thermo AQUATEC INOX RTWX-F 101

Indirect Heating Boiler Royal Thermo AQUATEC INOX RTWX-F 101

сом 13,050-36,540
IZTT LLC 🇷🇺
Corrosion and Deposit Inhibitor Novamin 906H

Corrosion and Deposit Inhibitor Novamin 906H

сом 783-5,220
Helamin Project LLC 🇷🇺
Utility Wash Sink 1-Section Foldable VMP-6-1-5 RCH with Shelf

Utility Wash Sink 1-Section Foldable VMP-6-1-5 RCH with Shelf

сом 13,050-41,760
ELINOX LLC 🇷🇺
Universal Ignition and Protection Device ZSU-PI-60

Universal Ignition and Protection Device ZSU-PI-60

сом 7,830-31,320
PROMA LLC 🇷🇺
TDU Distribution Control Units for Horizontal Heating Systems

TDU Distribution Control Units for Horizontal Heating Systems

сом 13,050-73,080
RIDAN LLC 🇷🇺
VA Type Stand for Combi Ovens and Equipment

VA Type Stand for Combi Ovens and Equipment

сом 13,050-73,080
SPECMASH LLC 🇷🇺
Support Stand for Stoves, Type PP

Support Stand for Stoves, Type PP

сом 1,305-5,220
PROMASH OJSC 🇷🇺
High Pressure Water Heater PV-250-180-21

High Pressure Water Heater PV-250-180-21

сом 783,000-3,132,000
SUZMK ENERGO OJSC 🇷🇺
Subtropic Electric Convector Heater, Model SUB/EC-1500 EMR

Subtropic Electric Convector Heater, Model SUB/EC-1500 EMR

сом 1,827-5,220
IZTT LLC 🇷🇺
Electric Convector Heater BALLU Enzo Model BEC/EZER-1000

Electric Convector Heater BALLU Enzo Model BEC/EZER-1000

сом 2,349-6,264
IZTT LLC 🇷🇺
Electric Convector Heater STARWIND SHV4520

Electric Convector Heater STARWIND SHV4520

сом 1,827-5,220
IZTT LLC 🇷🇺
Economical Stainless Steel Washing Tank VMO2-630ENK

Economical Stainless Steel Washing Tank VMO2-630ENK

сом 13,050-36,540
PISHTEKH LLC 🇷🇺
Gas Stove PRG-IIA-8-1 2DSh "Maxi

Gas Stove PRG-IIA-8-1 2DSh "Maxi

сом 182,700-522,000
KELER RUS LLC 🇷🇺
Liquid Heater Pramotronic STREAM 160

Liquid Heater Pramotronic STREAM 160

сом 13,050-41,760
ELTRA-TERMO OJSC 🇷🇺
Heating Block TB-3.2MA for Drying Applications

Heating Block TB-3.2MA for Drying Applications

сом 130,500-417,600
AGROPROMTECHNICA CJSC 🇷🇺
Gas Air Heater-Destratifier SA10025DT

Gas Air Heater-Destratifier SA10025DT

сом 130,500-417,600
Sibshvank OJSC 🇷🇺
High-Pressure Water Heater PVD-500-23-2.0

High-Pressure Water Heater PVD-500-23-2.0

сом 783,000-3,132,000
SUZMK ENERGO OJSC 🇷🇺
Electric Convector Heater MP-2000.2 for Efficient Heating

Electric Convector Heater MP-2000.2 for Efficient Heating

сом 1,305-4,176
REMO-TECHNOLOGIES LLC 🇷🇺
Stainless Steel Cleaning Sink VMC-C

Stainless Steel Cleaning Sink VMC-C

сом 7,830-46,980
Food Machinery Plant LLC 🇷🇺
2-Section Wall-Mounted Washing Sink VMP-6-2-5 RC with Shelf

2-Section Wall-Mounted Washing Sink VMP-6-2-5 RC with Shelf

сом 23,490-67,860
ELINOX LLC 🇷🇺
Thermal Proofing Cabinet SRT-6-6/8K for Bakery Products

Thermal Proofing Cabinet SRT-6-6/8K for Bakery Products

сом 78,300-261,000
ELINOX LLC 🇷🇺
Marine Electric Convector Heater SE-600, Model CIUL.681934.123

Marine Electric Convector Heater SE-600, Model CIUL.681934.123

сом 13,050-41,760
MSA NPC LLC 🇷🇺
Infrared Heater Hintek IC-08 for Industrial and Local Heating

Infrared Heater Hintek IC-08 for Industrial and Local Heating

сом 1,305-4,176
IZTT LLC 🇷🇺
Electric Convector Heater Zeder 20MS-01 for Efficient Heating

Electric Convector Heater Zeder 20MS-01 for Efficient Heating

сом 1,305-4,176
IZTT LLC 🇷🇺
Standard Seamless Washing Bath VMOc1-500SNK

Standard Seamless Washing Bath VMOc1-500SNK

сом 13,050-36,540
PISHTEKH LLC 🇷🇺
Dish Collection Trolley for Catering and Retail

Dish Collection Trolley for Catering and Retail

сом 7,830-31,320
BLOCK OJSC 🇷🇺
TSHG-8 Spindle Trolley for Food Service Operations

TSHG-8 Spindle Trolley for Food Service Operations

сом 13,050-46,980
CHUVASHTORGTECHNICA OJSC 🇷🇺
Stainless Steel Washing Sink VSM-3

Stainless Steel Washing Sink VSM-3

сом 18,270-57,420
BLOCK OJSC 🇷🇺
Electric Infrared Heater VI500MW

Electric Infrared Heater VI500MW

сом 1,305-4,176
REMO-TECHNOLOGIES LLC 🇷🇺
Infrared Heater Royal Thermo RTI-20

Infrared Heater Royal Thermo RTI-20

сом 1,827-5,220
IZTT LLC 🇷🇺
Cabin Heater System Installation 1101-47-1SB for CHETRA Machines

Cabin Heater System Installation 1101-47-1SB for CHETRA Machines

сом 13,050-46,980
PROMTTRACTOR LLC 🇷🇺
KC 111-2A Armor Plate Position 5 Heavy-Duty Protection

KC 111-2A Armor Plate Position 5 Heavy-Duty Protection

сом 261-1,566
CORVET-2000 CJSC 🇷🇺
Gas Air Heater for Efficient Heating and Drying TAH-300

Gas Air Heater for Efficient Heating and Drying TAH-300

сом 130,500-417,600
IEMZ Kupol OJSC 🇷🇺
Gas Air Heater for Efficient Heating and Drying of Large Spaces TAG-160

Gas Air Heater for Efficient Heating and Drying of Large Spaces TAG-160

сом 78,300-261,000
IEMZ Kupol OJSC 🇷🇺

FAQ

Can burners be configured for our local fuel quality?
Yes — fuel adaptation is a standard engineering request. Provide your gas pressure range or diesel specification and the factory selects jets, pumps and control settings accordingly. Dual-fuel burners that switch between gas and liquid fuel are widely produced and popular in markets with unstable gas supply.
Who performs commissioning of a boiler or heat substation?
Smaller boilers are commissioned by your local heating contractor using the supplied manuals and schematics. For industrial boilers and packaged substations, manufacturers typically offer supervised commissioning: either a factory engineer travels to site for an agreed fee, or commissioning is guided remotely with a checklist and video support.
What documentation is provided for project approval?
Standard sets include the technical passport, EAC declaration, hydraulic test certificate, burner adjustment records, and installation and operation manuals. For tender projects, suppliers can additionally provide dimensional drawings, electrical schematics and efficiency data sheets in English.
How long does manufacturing and delivery take?
Catalogue burners and wall boilers often ship from stock within 2 to 3 weeks. Floor-standing industrial boilers and packaged heat substations are built to order, typically in 45 to 90 days depending on capacity, plus sea or overland transit. Trucking to Central Asia is usually faster than sea routes.
Are spare parts a risk with imported boilers?
Boiler plants address this with recommended two-year spare kits — gaskets, electrodes, sensors, control boards — shipped with the equipment. Most wear parts are standardised, and consumables such as nozzles and ignition electrodes are also available from third-party suppliers, which reduces dependence on a single source.