Products — Heavy Construction Machinery
Concrete Mixer Truck ABS-3DA on KAMAZ-43255 Chassis Model 69362B
Liquid Waste Disposal Station for Household Waste and Sewage, AGMA-SL Series
SKP Series Modular Buildings - Transportable Construction Solution
Cementing Unit UZST Type UZST02 Model 5870-12 on Ural 55571-16 Chassis
Cementing Unit UZST Type UZST03 on KAMAZ 43118-RR Chassis
Cementing Unit AC-32 on Ural Chassis: 4320-1951-60, 4320-1951-62, 4320-1951-70, 4320-1951-72, 4320-1951-74
Automated Block Gas Distribution Station "Saratov-M" 21/1-5.4/1.8-21(1,2)-U1
Cementing Unit UZST Type UZST03 Model 5870-10 on KAMAZ 5350-D5 Chassis
Cementing Unit UZST03 5870-09 on KAMAZ 43118 Chassis
Cementing Unit UZST01 Model 5870-07 on Ural 4320-74 Chassis
Cementing Unit 707452 on Ural Chassis Type 4320 (Modifications 4320-1951-60, 4320-1951-62, 4320-1951-70, 4320-1951-72)
High Holding Power Anchor PDS, Weight: 125-15000 kg, TU 6411-001-03149576-2013
Pneumatic Spray Patching System for Road Repair - Madpatcher Trailer-Mounted
Bulldozers, Rollers and Pavers: Russian Heavy Machinery Without the Western Price Tag
Heavy construction equipment is where Russian engineering remains genuinely competitive on the world market. This category lists 433 positions from 108 suppliers, led by 91 bulldozer listings and 54 road rollers, with asphalt pavers (12), pile driving equipment (13), pipelayer cranes (16), tower cranes (10), concrete mixer trucks (33) and plate compactors filling out the road-building chain. Two industrial niches stand out: 34 cementing units for oilfield service and 26 packaged wastewater treatment plants. A spare parts section covers blades, undercarriage components and attachments.
The value proposition is consistent across the class: machines designed for minus 40 to plus 45 degree operation, mechanically serviceable in field conditions without dealer diagnostics, tolerant of variable fuel quality, and priced 25–40 percent below comparable Western units. For contractors in Africa, Central Asia and the Middle East running mixed fleets far from dealer networks, that maintainability is often the deciding factor.
- Trade terms: EXW plant, FOB Novorossiysk or St. Petersburg; RoRo or flat-rack shipment for oversized units.
- Lead time: stock machines ship in 2–4 weeks; built-to-order configurations typically 60–90 days.
- Support: operator manuals in English, commissioning supervision and recommended two-year spare kits negotiable.
- Documents: EAC conformity, deregistration and export customs papers handled by the seller.
State your job profile — soil, tonnage, climate — in a sourcing request and factories will propose specific models.