Товарлар — Электр кубаты жана бөлүштүрүү

Mobile Autonomous Electric Socket EnergyBox LUX-1000

Mobile Autonomous Electric Socket EnergyBox LUX-1000

сом 31,320-104,400
TECHNOLOGIES OF THE FUTURE LLC 🇷🇺
Туташтыргыч ШУ-206В

Туташтыргыч ШУ-206В

сом 2,610-15,660
GRAVITON LLC 🇷🇺
Мобилдик автономдук электр розетка EnergyBox LUX-1500

Мобилдик автономдук электр розетка EnergyBox LUX-1500

сом 39,150-130,500
TECHNOLOGIES OF THE FUTURE LLC 🇷🇺
Мобилдик автономдук электр розетка EnergyBox ECO-1000UPS

Мобилдик автономдук электр розетка EnergyBox ECO-1000UPS

сом 18,270-52,200
TECHNOLOGIES OF THE FUTURE LLC 🇷🇺
Розетка көчмө КЗЭТ-S-CC2-DC250A

Розетка көчмө КЗЭТ-S-CC2-DC250A

сом 78,300-313,200
SOEDINITEL-ELECTRO LLC 🇷🇺
Электр бөлүштүрүү колоннасы EAD-630-1

Электр бөлүштүрүү колоннасы EAD-630-1

сом 156,600-626,400
ELECTROAIR LLC 🇷🇺
Штепсель ШУ-205Б

Штепсель ШУ-205Б

сом 7,830-26,100
GRAVITON LLC 🇷🇺
BRP-16 Power Distribution Unit SAMP.468261.002

BRP-16 Power Distribution Unit SAMP.468261.002

сом 13,050-46,980
SIRIUS LLC 🇷🇺
ЭЛЕКТРОПИТАНИЕ ИВЭПР 12/2 RS-R3

ЭЛЕКТРОПИТАНИЕ ИВЭПР 12/2 RS-R3

сом 7,830-26,100
KB POZHARNOY AVTOMATIKI LLC 🇷🇺
ЭЛЕКТРОПИТАНИЕ ИВЭПР 12/2 RS-R2

ЭЛЕКТРОПИТАНИЕ ИВЭПР 12/2 RS-R2

сом 13,050-36,540
KB POZHARNOY AVTOMATIKI LLC 🇷🇺
ExOnSys Operational DC Systems for Efficient Power Management

ExOnSys Operational DC Systems for Efficient Power Management

сом 783,000-5,220,000
ELEKTRONMASH OJSC 🇷🇺
Constant Current Operational System SOPT-SESH

Constant Current Operational System SOPT-SESH

сом 261,000-1,566,000
ELECTROSHIT Group OJSC - SAMARA TM 🇷🇺
DC Power Supply Systems for Category I Consumers

DC Power Supply Systems for Category I Consumers

сом 261,000-1,566,000
CHETA LLC 🇷🇺
Operational Direct Current System (ODCS)

Operational Direct Current System (ODCS)

сом 783,000-5,220,000
EKRA LLC 🇷🇺
Modular DC Distribution System RSPT-M

Modular DC Distribution System RSPT-M

сом 261,000-1,566,000
SPT LLC 🇷🇺
Power Supply System for UAV VT-440 TREL.566111.001

Power Supply System for UAV VT-440 TREL.566111.001

сом 78,300-313,200
KRAVT LLC 🇷🇺

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.