Товарлар — Электр кубаты жана бөлүштүрүү

High Voltage Oil Transformers for Power Distribution

High Voltage Oil Transformers for Power Distribution

сом 2,610,000-15,660,000
ELMAS (UETM) LLC 🇷🇺
AC Power Supply SKAT-VN.24/27AC - 24V/27V Output

AC Power Supply SKAT-VN.24/27AC - 24V/27V Output

сом 783-3,132
BASTION CJSC 🇷🇺
Avtotransformator tipi ATDCTN-63000/220/110 U1,UHL1,XHL1

Avtotransformator tipi ATDCTN-63000/220/110 U1,UHL1,XHL1

сом 7,830,000-26,100,000
TOGLIATTI TRANSFORMER LLC 🇷🇺
TM-630 10/0.4 Oil Distribution Transformer 630 kVA

TM-630 10/0.4 Oil Distribution Transformer 630 kVA

сом 261,000-783,000
Alttras OJSC 🇷🇺
Үч фазалуу май трансформатору ТРДП-12500/35 Ж

Үч фазалуу май трансформатору ТРДП-12500/35 Ж

сом 7,830,000-26,100,000
ELMAS (UETM) LLC 🇷🇺
Трансформатор кургак ТС 100/6(10)/0,4

Трансформатор кургак ТС 100/6(10)/0,4

сом 130,500-417,600
ZEM LLC 🇷🇺
Үч фазалуу майлык күч трансформатору ТРДНС-32000/110-У1

Үч фазалуу майлык күч трансформатору ТРДНС-32000/110-У1

сом 7,830,000-26,100,000
Voronezh Transformer LLC 🇷🇺
Трансформатор ТС-630/6-У3

Трансформатор ТС-630/6-У3

сом 783,000-2,610,000
KPM LLC 🇷🇺
ТИМ трансформатору

ТИМ трансформатору

сом 26.10-208.80
STRELA OJSC 🇷🇺
Трансформатор ОСО-0,25-09 УХЛ 3 380/110

Трансформатор ОСО-0,25-09 УХЛ 3 380/110

сом 783-2,610
IK-1 FSIN of Russia in Kostroma Oblast 🇷🇺
Трансформатор күч ОЛ-НТЗ-0,63(1,0)/35-III

Трансформатор күч ОЛ-НТЗ-0,63(1,0)/35-III

сом 78,300-261,000
NTZ VOLKHOV LLC 🇷🇺
Трансформатор күчтүү майлуу ТМН-6300/35 У1,УХЛ1,ХЛ1

Трансформатор күчтүү майлуу ТМН-6300/35 У1,УХЛ1,ХЛ1

сом 1,305,000-4,176,000
TOGLIATTI TRANSFORMER LLC 🇷🇺
Transformator silovoy maslyanyy tipa TRDCN-63000/220 U1,UHL1,HL1

Transformator silovoy maslyanyy tipa TRDCN-63000/220 U1,UHL1,HL1

сом 7,830,000-26,100,000
TOGLIATTI TRANSFORMER LLC 🇷🇺
Transformator TSZM-63-380/230 OM5 U/Uн-0

Transformator TSZM-63-380/230 OM5 U/Uн-0

сом 78,300-208,800
ELLIPS LLC 🇷🇺
Трансформатор ТСЗМ-10-380/230 ОМ5 У/Ун-0

Трансформатор ТСЗМ-10-380/230 ОМ5 У/Ун-0

сом 39,150-130,500
ELLIPS LLC 🇷🇺

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.