Товарлар — Электр кубаты жана бөлүштүрүү

Uninterruptible Power Supply PS12-6-26

Uninterruptible Power Supply PS12-6-26

сом 7,830-26,100
NITP NITA LLC 🇷🇺
ИБП СИПБ2БА.9-11 2000 ВА

ИБП СИПБ2БА.9-11 2000 ВА

сом 39,150-104,400
PARUS ELECTRO LLC 🇷🇺
Күч берүүчү жабдык СИПБ3КА.9-11 220В 9А·Ч

Күч берүүчү жабдык СИПБ3КА.9-11 220В 9А·Ч

сом 31,320-104,400
Svyaz Engineering OJSC 🇷🇺
Uninterruptible Power Supply (UPS) BBP-20M

Uninterruptible Power Supply (UPS) BBP-20M

сом 2,349-7,308
SIBALYANS LLC 🇷🇺
Uninterruptible Power Supply for Data Centers - MIR3

Uninterruptible Power Supply for Data Centers - MIR3

сом 783,000-6,264,000
MIROTEK SYSTEMS LLC 🇷🇺
Uninterruptible Power Supply BPP RAPAN-30

Uninterruptible Power Supply BPP RAPAN-30

сом 1,305-4,176
BASTION CJSC 🇷🇺
Uninterruptible Power Supply MS04-UPS

Uninterruptible Power Supply MS04-UPS

сом 78,300-261,000
ADS LLC 🇷🇺
ИБП PitON ХТ-Сериясы 20 кВА

ИБП PitON ХТ-Сериясы 20 кВА

сом 417,600-1,305,000
Piton Kama LLC 🇷🇺
Uninterruptible Power Supply UPS-NT for Industrial Applications

Uninterruptible Power Supply UPS-NT for Industrial Applications

сом 783,000-3,132,000
NIPOM OJSC 🇷🇺
ИБП СИП380А500БД.9-33

ИБП СИП380А500БД.9-33

сом 1,305,000-4,176,000
PARUS ELECTRO LLC 🇷🇺
ИБП СИПБ6КД.9-11/БПС

ИБП СИПБ6КД.9-11/БПС

сом 62,640-191,400
PARUS ELECTRO LLC 🇷🇺
Uninterruptible Power Supply Device 2 (PBP2)

Uninterruptible Power Supply Device 2 (PBP2)

сом 783,000-3,132,000
OJSC "NPO Aurora" 🇷🇺
Uninterruptible Power Supply SKAT-1200A

Uninterruptible Power Supply SKAT-1200A

сом 783-2,610
BASTION CJSC 🇷🇺
ИБП PitON РТ-Сериясы 2 кВА

ИБП PitON РТ-Сериясы 2 кВА

сом 36,540-95,700
Piton Kama LLC 🇷🇺
Компакттуу ИБП сериясы СИП380/КПТ

Компакттуу ИБП сериясы СИП380/КПТ

сом 783,000-15,660,000
PARUS ELECTRO LLC 🇷🇺
Uninterruptible Power Supply SCAT-1200 BTR

Uninterruptible Power Supply SCAT-1200 BTR

сом 1,305-4,176
BASTION CJSC 🇷🇺
Uninterruptible Power Supply SKAT-2400I7 Version 5000

Uninterruptible Power Supply SKAT-2400I7 Version 5000

сом 7,830-26,100
BASTION CJSC 🇷🇺
ИБП СИПБ2КA.9-11/СУХ

ИБП СИПБ2КA.9-11/СУХ

сом 31,320-83,520
PARUS ELECTRO LLC 🇷🇺
Reliable Uninterruptible Power Supply SCAT-2400M

Reliable Uninterruptible Power Supply SCAT-2400M

сом 3,132-10,440
BASTION CJSC 🇷🇺
Uninterruptible Power Supply System 0.7 - 6 kVA

Uninterruptible Power Supply System 0.7 - 6 kVA

сом 52,200-626,400
INVERTER OJSC 🇷🇺
Compact LiFePO4 Battery for UPS 24V 12Ah

Compact LiFePO4 Battery for UPS 24V 12Ah

сом 7,830-20,880
TECHMAKE LAB LLC 🇷🇺
Импульс Юниор 850 ВА/510 Вт

Импульс Юниор 850 ВА/510 Вт

сом 3,132-8,352
SYSTEMOTECHNICS LLC 🇷🇺
Uninterruptible Power Supply PS12-6-12

Uninterruptible Power Supply PS12-6-12

сом 7,830-26,100
NITP NITA LLC 🇷🇺
Uninterruptible Power Supply BBP-30 SLT

Uninterruptible Power Supply BBP-30 SLT

сом 1,305-4,176
SIBALYANS LLC 🇷🇺
Uninterruptible Power Supply SKAT-2400

Uninterruptible Power Supply SKAT-2400

сом 3,132-13,050
BASTION CJSC 🇷🇺
Uninterruptible Power Supply SKAT-1200U2

Uninterruptible Power Supply SKAT-1200U2

сом 7,830-26,100
BASTION CJSC 🇷🇺
Токту электр энергиясы агрегаты

Токту электр энергиясы агрегаты

сом 783,000-15,660,000
PARUS ELECTRO LLC 🇷🇺
ИБП СИПБ2КА.10-11

ИБП СИПБ2КА.10-11

сом 31,320-83,520
PARUS ELECTRO LLC 🇷🇺
Three-Phase Uninterruptible Power Supply IDP-3-3/3-10-380-C

Three-Phase Uninterruptible Power Supply IDP-3-3/3-10-380-C

сом 365,400-1,566,000
ELECTROMASH OJSC 🇷🇺
ИБП СИПБ2КА.9-11

ИБП СИПБ2КА.9-11

сом 26,100-73,080
PARUS ELECTRO LLC 🇷🇺
ИБП PitON ХТ-Серия 40 кВА

ИБП PitON ХТ-Серия 40 кВА

сом 522,000-1,566,000
Piton Kama LLC 🇷🇺
Uninterruptible Power Supply Device PБЭП

Uninterruptible Power Supply Device PБЭП

сом 130,500-522,000
OJSC "NPO Aurora" 🇷🇺
Uninterruptible Power Supply System for Equipment 100 - 400 kVA

Uninterruptible Power Supply System for Equipment 100 - 400 kVA

сом 1,305,000-4,176,000
INVERTER OJSC 🇷🇺
Uninterruptible Power Supply RAPAN-100 for 12V 10A Systems

Uninterruptible Power Supply RAPAN-100 for 12V 10A Systems

сом 3,132-10,440
BASTION CJSC 🇷🇺

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.