Products — Power Supply & Distribution

External Rotor Sensor Holder 20-031058

External Rotor Sensor Holder 20-031058

$3-18
ROSISOLIT LLC 🇷🇺
Low Voltage Complete Device (NKVU)

Low Voltage Complete Device (NKVU)

$900-18,000
VIBRATOR OJSC 🇷🇺
High-Frequency Interference Suppressor AVLB.672861.011

High-Frequency Interference Suppressor AVLB.672861.011

$900-3,600
CJSC "NPO "EIS" 🇷🇺
Marine Power Supply Systems for RSD59 Project

Marine Power Supply Systems for RSD59 Project

$9,000-60,000
SHIP SERVICE LLC 🇷🇺
AC Voltage Source B2-9 for Measuring Instruments

AC Voltage Source B2-9 for Measuring Instruments

$900-3,000
TECHNOYAKS OJSC 🇷🇺
External Rotor Sensor Holder 20-031058

External Rotor Sensor Holder 20-031058

$3-18
LABARA-RUS LLC 🇷🇺
Energy Storage System (SNE)

Energy Storage System (SNE)

$90,000-960,000
SPT LLC 🇷🇺
Three-Phase Voltage Transformers NALI-EC-24 M7P

Three-Phase Voltage Transformers NALI-EC-24 M7P

$1,500-5,400
ELECTROSHIT-K° LLC 🇷🇺
Combined Current and Voltage Transformer TTNK

Combined Current and Voltage Transformer TTNK

$9,000-36,000
PROFOTEK OJSC 🇷🇺
Rotating Contact Device for Power Transmission VKU1.000

Rotating Contact Device for Power Transmission VKU1.000

$900-3,600
ELECTROMASHINA OJSC 🇷🇺
BRIT-S-90-110-550/2000 KN Transformer Bushing Type

BRIT-S-90-110-550/2000 KN Transformer Bushing Type

$1,500-4,800
H ENERGY LLC 🇷🇺
Gas Regulation Station Block - GRPB

Gas Regulation Station Block - GRPB

$15,000-60,000
PJSC GAZPROM GAZORASPREDELENIE UFA 🇷🇺
Rotating Contact Device VKU330-4.000

Rotating Contact Device VKU330-4.000

$900-3,600
ELECTROMASHINA OJSC 🇷🇺
Rotor Sensor Holder for Wind Turbines Model 20-031058

Rotor Sensor Holder for Wind Turbines Model 20-031058

$3-18
ELECTROCOMPOSIT LLC 🇷🇺
Energy Consumption Optimizer OEP-3

Energy Consumption Optimizer OEP-3

$1,500-9,000
Energy Optimum LLC 🇷🇺
Ceiling Power Supply System ST SEP-32

Ceiling Power Supply System ST SEP-32

$900-6,000
SOYUZTEHNOLOGIYA LLC 🇷🇺
Block Distribution Point RPB for 6-35 kV Power Systems

Block Distribution Point RPB for 6-35 kV Power Systems

$18,000-120,000
TRANSFORMER URAL LLC 🇷🇺
Three-Phase Fan Speed Controller RСVT7

Three-Phase Fan Speed Controller RСVT7

$90-300
Contact OJSC 🇷🇺
Autonomous Power Supply System (APSS) 39X6M1

Autonomous Power Supply System (APSS) 39X6M1

$90,000-360,000
PRZ OJSC 🇷🇺
Electricity Generation for Sever-Soleninskoye Field

Electricity Generation for Sever-Soleninskoye Field

$60,000-600,000
NORILSKGAZPROM OJSC 🇷🇺
BRIT-S-90-110-550/2000 KN Type Transformer Feedthrough

BRIT-S-90-110-550/2000 KN Type Transformer Feedthrough

$1,500-4,800
H ENERGY LLC 🇷🇺

Transformers, UPS and Power Supplies for Grid and Facility Projects

From a wall-mounted power module to a packaged substation, this 3,015-listing category from 532 suppliers covers the full power conversion chain. The depth is in the mid-range: 474 power supplies and modules, 306 starter batteries, 303 inverters, rectifiers and chargers, 269 stationary and lithium-ion batteries, 249 power transformers, 230 uninterruptible power supplies, 171 instrument current transformers and 85 voltage transformers, 119 special and choke transformers, 109 switchgear positions, 74 packaged substations, plus measurement transducers and voltage stabilizers.

Transformer building is a long-standing Russian export strength — machines for utilities across Asia, Africa and Latin America have come from these plants for decades, and service infrastructure for them already exists in many importing countries. The battery and UPS segment grew more recently on telecom and data-centre demand. Across the category, equipment is engineered for wide temperature ranges and tolerant of grid disturbance, with routine factory testing documented per unit.

  • Utility equipment: distribution transformers and packaged substations configured to your network voltages and vector groups.
  • Factory tests: routine test protocols per transformer and UPS; witnessed acceptance available for utility orders.
  • Battery logistics: lithium systems ship under dangerous-goods rules; suppliers prepare UN-compliant packaging and documents.
  • Order scale: single units for facilities; framework contracts for utility tender volumes.
  • Delivery: FOB Novorossiysk or St. Petersburg; rail and truck across the EAEU and Central Asia.

State your network parameters and load profile in a sourcing request and manufacturers will configure and quote the equipment.

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.