Turbine Upgrade Kit for T-100/120-130-2 Model | UK TES LLC | Wholesale from Russia
1
Request Details
2
Contact Info
What do you need?

Describe the product or service you are looking for

Your Contact Information

We will contact you as soon as possible

Request Submitted!

Thank you! We will contact you soon with the best offers.

Turbine Upgrade Kit for T-100/120-130-2 Model

Turbine Upgrade Kit for T-100/120-130-2 Model — UK TES LLC

$300,000 - $1,800,000 USD
MOQ: 1 sets

Key Features

Minimum scope of modernization: technical re-equipment of turbine series t-100/110-120: replaces resource units and parts, operating at temperatures above 450°c, which allows renewal of the entire turbine's resource, as well as improving technical and economic indicators of the turbine,
Average volume of modernization: besides replacing resource units and high-pressure cylinder parts, additionally includes replacing worn elements of the medium-pressure flow part, which improves the reliability of the medium-pressure part
Maximum scope of modernization: additional to the average option, worn elements of the low-pressure flow part are replaced, improving reliability

Description

Kit for technical re-equipment of steam turbine T-100/120-130-2 is designed for its modernisation with replacement of high-temperature units and parts that have exhausted their resource. Composition of the Kit: a new CVD complete, CVD stator flange and rotor with highly efficient blade profiles and developed overband seals, CVD seals (front, rear and diaphragm seals), Front Bearing Block complete, including. support liner, GMN and servo-motor VD, complete with foundation frame, support liner, control valves, stop valve block, VDC camshaft distributor, turbine cladding, set of pipelines for installation of the supplied equipment, as well as diaphragms of the 20th, 21st, 22nd and 23rd stages of DDC, ND servomotor, regulating diaphragms of the 24th and 26th stages of DDC, sets of working blades of the 24th and 26th stages of DDC to replace the corresponding units and parts of SD and ND having a high degree of wear

Related Products

High-Pressure Cylinder Upgrade Kit for T-100 Steam Turbine

High-Pressure Cylinder Upgrade Kit for T-100 Steam Turbine

$90,000-$600,000 USD
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
Steam Turbine Upgrade Kit K-215-130-1M3 for CND Block #9

Steam Turbine Upgrade Kit K-215-130-1M3 for CND Block #9

$90,000-$360,000 USD
Maximum steam flow rate through CND: 480
Nominal temperature of fresh steam upstream of CVD stop valves: 540
SILOVYE MASHINY OJSC 🇷🇺
Steam Turbine Modernization Kit T-100

Steam Turbine Modernization Kit T-100

$60,000-$600,000 USD
Minimum scope of modernization: modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
Complete Upgrade Kit for CND K-210(215)-12.8 Turbine Block

Complete Upgrade Kit for CND K-210(215)-12.8 Turbine Block

$90,000-$360,000 USD
Rated power: 210
Maximum steam flow rate through CND: 480
SILOVYE MASHINY OJSC 🇷🇺
High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade

High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade

$90,000-$600,000 USD
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine

High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine

$90,000-$600,000 USD
Minimum scope of modernization: modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
Steam Turbine Diaphragm 30 Stages Model 47T230-3219

Steam Turbine Diaphragm 30 Stages Model 47T230-3219

$9,000-$30,000 USD
Overall dimensions (diameter): 2950
Overall dimensions (width): 420
UK TES LLC 🇷🇺
Modular Vise PQ160 with Amplifier and Step Jaws Set BB.VS.160.11.002

Modular Vise PQ160 with Amplifier and Step Jaws Set BB.VS.160.11.002

$150-$420 USD
Jaw width: 160
Workpiece clamping force: 54000
ARMORICA LLC 🇷🇺
T-60/66-10.2 Steam Turbine - Single-Cylinder Design

T-60/66-10.2 Steam Turbine - Single-Cylinder Design

$900,000-$3,000,000 USD
Rated power: 66
Maximum heat load: 143
UTZ OJSC 🇷🇺
Steam Turbine P-50-12.8/0.8

Steam Turbine P-50-12.8/0.8

$90,000-$360,000 USD
Fresh steam consumption: 330
Fresh steam pressure: 12.8
UTZ OJSC 🇷🇺
Stator Section Kit for Electric Motor A-114-4 (320kW, 6000V, 1480 RPM) RESIN Technology

Stator Section Kit for Electric Motor A-114-4 (320kW, 6000V, 1480 RPM) RESIN Technology

$900-$3,600 USD
Section length: 900
Section width: 319
REM END COIL LLC 🇷🇺
Stator Section Set for Electric Motor FVEZ909714

Stator Section Set for Electric Motor FVEZ909714

$3,000-$18,000 USD
Section length: 1700
Section width: 262
REM END COIL LLC 🇷🇺
Stator Winding Section Kit for Electric Motor 6A355M4

Stator Winding Section Kit for Electric Motor 6A355M4

$900-$3,000 USD
Section length: 945
Section width: 270
REM END COIL LLC 🇷🇺
Stator Coil Sections Set for ALSTOM AA58 L9 Electric Motor

Stator Coil Sections Set for ALSTOM AA58 L9 Electric Motor

$900-$3,600 USD
Section length: 1432
Section width: 310
REM END COIL LLC 🇷🇺
Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

$900,000-$3,000,000 USD
Maximum power: 220
Pressure: 12.8
UTZ OJSC 🇷🇺
Stator Coil Section Set for SDV-16-41-6 Electric Motor

Stator Coil Section Set for SDV-16-41-6 Electric Motor

$3,000-$18,000 USD
Section length: 790
Section width: Polyvinyl chloride plasticate, halogen-free composition
REM END COIL LLC 🇷🇺
Stator Section Kit for JUDE Electric Motor A-25544

Stator Section Kit for JUDE Electric Motor A-25544

$900-$3,600 USD
Section length: 1090
Section width: 297
REM END COIL LLC 🇷🇺
Diaphragm for Steam Turbine Cylinder Separation 47T230-3216

Diaphragm for Steam Turbine Cylinder Separation 47T230-3216

$3,000-$18,000 USD
Outer diameter: 2274
Weight: 2466
URAL TURBO MECHANIC LLC 🇷🇺
Stator Section Kit for Electric Motor 109281 (400kW, 6000V, 982RPM) - RESIN RICH Technology

Stator Section Kit for Electric Motor 109281 (400kW, 6000V, 982RPM) - RESIN RICH Technology

$900-$3,600 USD
Section length: 1040
Section width: 254
REM END COIL LLC 🇷🇺
Turbine Diaphragm 24 Stages 47T230-3216

Turbine Diaphragm 24 Stages 47T230-3216

$3,000-$18,000 USD
Overall dimensions (diameter): 2274
Overall dimensions (width): 254
UK TES LLC 🇷🇺
Request via WhatsApp