产品 — 电源与配电

Throttle Transformer DTE-0.6-1000 for Railway Electrification

Throttle Transformer DTE-0.6-1000 for Railway Electrification

¥6,480-21,600
ELTEZA OJSC 🇷🇺
Signal Transformer DTE-0.2-1500 for Railway Automation

Signal Transformer DTE-0.2-1500 for Railway Automation

¥648-2,160
ELTEZA OJSC 🇷🇺
Throttle Transformer DTE-0.6-500 (n=15)

Throttle Transformer DTE-0.6-500 (n=15)

¥3,024-12,960
ELTEZA OJSC 🇷🇺
Throttle Transformer DTE-0.2-1000 (n=23)

Throttle Transformer DTE-0.2-1000 (n=23)

¥3,240-12,960
ELTEZA OJSC 🇷🇺
AC Choke Transformers DT-1MG2-300 for Railway Automation

AC Choke Transformers DT-1MG2-300 for Railway Automation

¥648-2,160
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer PRT-G

Dry Single-Phase Transformer PRT-G

¥64.80-259.20
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer PT-25G-1

Dry Single-Phase Transformer PT-25G-1

¥108-432
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer ST-4M

Dry Single-Phase Transformer ST-4M

¥64.80-259.20
ELTEZA OJSC 🇷🇺
Signal Transformer DTE-0.2-1500CN for Railway Automation

Signal Transformer DTE-0.2-1500CN for Railway Automation

¥648-2,160
ELTEZA OJSC 🇷🇺
Throttle Transformer DTE-0.6-1000 for Railway Applications

Throttle Transformer DTE-0.6-1000 for Railway Applications

¥6,480-21,600
ELTEZA OJSC 🇷🇺
AC Choke Transformer DT-1MG2-450 for Signal Devices

AC Choke Transformer DT-1MG2-450 for Signal Devices

¥2,160-12,960
ELTEZA OJSC 🇷🇺

发布您的采购需求

从认证供应商获取报价

节省时间
AC Current Choke Transformers DT-1MG1-450

AC Current Choke Transformers DT-1MG1-450

¥3,240-12,960
ELTEZA OJSC 🇷🇺
DTE-0.2-1500 Choke Transformer for Railway Automation

DTE-0.2-1500 Choke Transformer for Railway Automation

¥648-2,160
ELTEZA OJSC 🇷🇺
Single-Phase Sealed Transformer POBS-3G

Single-Phase Sealed Transformer POBS-3G

¥108-432
ELTEZA OJSC 🇷🇺
Dry Single Phase Transformer ST-4G

Dry Single Phase Transformer ST-4G

¥64.80-259.20
ELTEZA OJSC 🇷🇺
Sealed Single-Phase Transformer ST-5G

Sealed Single-Phase Transformer ST-5G

¥108-432
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer POBC-2G

Dry Single-Phase Transformer POBC-2G

¥216-1,296
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer ST-4P3M

Dry Single-Phase Transformer ST-4P3M

¥64.80-259.20
ELTEZA OJSC 🇷🇺
DC-AC Choke Transformer DTE-0.2-500 (n=23)

DC-AC Choke Transformer DTE-0.2-500 (n=23)

¥6,480-21,600
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer PT-25M-2

Dry Single-Phase Transformer PT-25M-2

¥108-432
ELTEZA OJSC 🇷🇺
Throttle Transformer DTE-0.4-1500CN (n=3)

Throttle Transformer DTE-0.4-1500CN (n=3)

¥648-2,592
ELTEZA OJSC 🇷🇺
AC Choke Transformers 2DT-1MG1-300

AC Choke Transformers 2DT-1MG1-300

¥648-2,592
ELTEZA OJSC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.