产品 — 电源与配电

Energy Accounting and Distribution Box YAUR-3/12 LIGHT IEK

Energy Accounting and Distribution Box YAUR-3/12 LIGHT IEK

¥108-345.60
IEK Holding LLC 🇷🇺
Distribution and Metering Box YAUR-380-300-31-L LIGHT IEK

Distribution and Metering Box YAUR-380-300-31-L LIGHT IEK

¥64.80-216
IEK Holding LLC 🇷🇺
Power Distribution and Metering Box YAUR-380-300 IP31 Model IEK

Power Distribution and Metering Box YAUR-380-300 IP31 Model IEK

¥64.80-216
IEK Holding LLC 🇷🇺
Portable Power Plug PSN02-063-5 MAGNUM 63A 3P+PE+N IP67

Portable Power Plug PSN02-063-5 MAGNUM 63A 3P+PE+N IP67

¥64.80-216
IEK Holding LLC 🇷🇺
MTT13-012-0251-54 Transformer for 12V Power Supply

MTT13-012-0251-54 Transformer for 12V Power Supply

¥108-345.60
IEK Holding LLC 🇷🇺
MTT13-042-0251-54 AC to DC Converter 12V/24V/36V/42V IP54 IEK

MTT13-042-0251-54 AC to DC Converter 12V/24V/36V/42V IP54 IEK

¥302.40-1,080
IEK Holding LLC 🇷🇺
AC-DC Voltage Converter 12V, 24V, 36V, 42V - MTT12-024-0251-54

AC-DC Voltage Converter 12V, 24V, 36V, 42V - MTT12-024-0251-54

¥216-691.20
IEK Holding LLC 🇷🇺
Side Panel for VRU 2000 600 SMART (Set of 2) - YKV-PB-20-60

Side Panel for VRU 2000 600 SMART (Set of 2) - YKV-PB-20-60

¥21.60-86.40
IEK Holding LLC 🇷🇺

发布您的采购需求

从认证供应商获取报价

节省时间
230/24V AC to DC Voltage Converter MTT13-024-0251-54

230/24V AC to DC Voltage Converter MTT13-024-0251-54

¥302.40-1,080
IEK Holding LLC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.