Power Transformers
Current Transformers (Instrument)
Voltage Transformers (Instrument)
Special Purpose & Choke Transformers
Uninterruptible Power Supplies (UPS)
Voltage Stabilizers
Power Supplies & Power Modules
Inverters, Rectifiers & Battery Chargers
Frequency Converters / VFD
Measurement Transducers (Current, Voltage, Power)
Switchgear & Low-Voltage Distribution Equipment
Packaged Substations
Starter Batteries
Stationary & Lithium-Ion Batteries
Solar Power Plants & PV Modules
Power Supply & DC Backup Systems
Redundant Secondary Power Sources
Industrial Sockets & Power Columns
EV Charging Stations
Other Power Distribution Equipment
产品 — 电源与配电
Electricity Transmission and Technological Connection Services for Distribution Networks
¥2,160-432,000
LOESK OJSC 🇷🇺
Ultra-Fast Charging Station for Electric Buses Model UBZS E-PROM 300
¥302,400-1,080,000
ENERGOINNOVATIONS LLC 🇷🇺
Electric Vehicle Charging Station FORA EZS-AC AО "GRPZ" VIAM.565326.003 TU
¥64,800-432,000
GRPZ OJSC 🇷🇺
Shielded Connector Plug for Flexible and Stationary Power Wiring - SHCH Model
¥64.80-259.20
ECON LLC 🇷🇺
Mobile Autonomous Electric Socket EnergyBox ECO-300UPS
¥1,512-4,320
TECHNOLOGIES OF THE FUTURE LLC 🇷🇺
Double Socket with Grounding for Hidden Installation, 16A, 250V, White, E604.00
¥8.64-34.56
CADUCEUS LLC 🇷🇺
Mobile Standalone Electric Socket EnergyBox PRO-3000
¥6,480-21,600
TECHNOLOGIES OF THE FUTURE LLC 🇷🇺
Caduceus Aling Mode Double Socket with Ground, 16A, 250V, Anthracite, Art. 66512.A
¥10.80-43.20
CADUCEUS LLC 🇷🇺
Double Socket Outlet with Grounding, 2x16A, 250V~ - CADUCEUS ALING Experience Model 74162.0
¥10.80-34.56
CADUCEUS LLC 🇷🇺
Mobile Autonomous Electric Socket EnergyBox PRO-6000
¥6,480-21,600
TECHNOLOGIES OF THE FUTURE LLC 🇷🇺
Portable Charging Connector for Electric Transport KZET-S-GB2-3AC32A
¥648-2,592
SOEDINITEL-ELECTRO LLC 🇷🇺
Double Socket with Grounding, CADUCEUS ALING MODE 16A, 250V, White, Art. 66512.0
¥6.48-25.92
CADUCEUS LLC 🇷🇺
常见问题
•Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
•What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
•How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
•Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
•Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
•What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.