产品 — 电源与配电

Non-Grounded Voltage Transformers NOL-6(10) kV

Non-Grounded Voltage Transformers NOL-6(10) kV

¥3,240-12,960
SZTT OJSC 🇷🇺
Non-grounded Voltage Transformer NOLP-6(10)M

Non-grounded Voltage Transformer NOLP-6(10)M

¥648-2,592
SZTT OJSC 🇷🇺

Voltage Transformer NAMIT for 6-35 kV Power Networks

¥2,160-43,200
ST OJSC 🇷🇺
Grounded Voltage Transformer ZNOL.03-6(10) kV

Grounded Voltage Transformer ZNOL.03-6(10) kV

¥648-2,160
SZTT OJSC 🇷🇺
Grounding Voltage Transformers ZNOL-6(10)kV

Grounding Voltage Transformers ZNOL-6(10)kV

¥1,080-3,888
SZTT OJSC 🇷🇺
Non-Grounded Voltage Transformers NOL.12-0.38(0.69) kV

Non-Grounded Voltage Transformers NOL.12-0.38(0.69) kV

¥648-2,592
SZTT OJSC 🇷🇺
Grounding Voltage Transformer ZNOL-NTZ-35-IV

Grounding Voltage Transformer ZNOL-NTZ-35-IV

¥6,480-21,600
NTZ VOLKHOV LLC 🇷🇺
Anti-Resonance Voltage Transformer NALI-NTZ-35-IV

Anti-Resonance Voltage Transformer NALI-NTZ-35-IV

¥10,800-34,560
NTZ VOLKHOV LLC 🇷🇺
Grounding Voltage Transformer ZNOLP-EC M3

Grounding Voltage Transformer ZNOLP-EC M3

¥2,160-12,960
ELECTROSHIT-K° LLC 🇷🇺
Grounded Voltage Transformer NOL-EC M2

Grounded Voltage Transformer NOL-EC M2

¥1,080-6,480
ELECTROSHIT-K° LLC 🇷🇺
Grounding Voltage Transformer ZNOL-EK M4

Grounding Voltage Transformer ZNOL-EK M4

¥648-3,024
ELECTROSHIT-K° LLC 🇷🇺
Anti-Resonance Single-Phase Voltage Transformer NAMI-110 UHL1

Anti-Resonance Single-Phase Voltage Transformer NAMI-110 UHL1

¥64,800-216,000
RETZ ENERGY OJSC 🇷🇺
Non-grounding Voltage Transformers NOL-6(10)M IV

Non-grounding Voltage Transformers NOL-6(10)M IV

¥648-2,592
SZTT OJSC 🇷🇺
Grounding Voltage Transformer ZNOLP-EK M1

Grounding Voltage Transformer ZNOLP-EK M1

¥648-3,888
ELECTROSHIT-K° LLC 🇷🇺
Non-Grounded Voltage Transformer NOL-NTZ-IV

Non-Grounded Voltage Transformer NOL-NTZ-IV

¥6,480-21,600
NTZ VOLKHOV LLC 🇷🇺
Grounding Voltage Transformers ZNOL.06-3 kV

Grounding Voltage Transformers ZNOL.06-3 kV

¥1,080-3,888
SZTT OJSC 🇷🇺
ZNOL-SVEL Voltage Transformers 6-35 kV

ZNOL-SVEL Voltage Transformers 6-35 kV

¥648-4,320
SVEL Group OJSC 🇷🇺
Voltage Transformers ZNOL - SESh - 6, 10, 15, 20, 35 kV

Voltage Transformers ZNOL - SESh - 6, 10, 15, 20, 35 kV

¥648-6,480
ELECTROSHIT Group OJSC - SAMARA TM 🇷🇺
Voltage Measuring Transformers for Electric Devices ZNG-UETM®-500

Voltage Measuring Transformers for Electric Devices ZNG-UETM®-500

¥64,800-216,000
ELMAS (UETM) LLC 🇷🇺
Non-grounded Voltage Transformers NOL.11-6.O5

Non-grounded Voltage Transformers NOL.11-6.O5

¥648-2,160
SZTT OJSC 🇷🇺
Three-Phase Anti-Resonance Voltage Transformer NALI-EC-15 (20) M8P

Three-Phase Anti-Resonance Voltage Transformer NALI-EC-15 (20) M8P

¥6,480-25,920
ELECTROSHIT-K° LLC 🇷🇺
Non-Grounded Voltage Transformers NOL-35 III

Non-Grounded Voltage Transformers NOL-35 III

¥1,080-3,888
SZTT OJSC 🇷🇺
Grounded Voltage Transformers ZNOL.06-6(10;15;20;24;27) kV

Grounded Voltage Transformers ZNOL.06-6(10;15;20;24;27) kV

¥1,296-12,960
SZTT OJSC 🇷🇺
Laboratory Voltage Transformers NLL-3

Laboratory Voltage Transformers NLL-3

¥6,480-25,920
SZTT OJSC 🇷🇺
Voltage Transformer NOM Series for Measurement and Protection

Voltage Transformer NOM Series for Measurement and Protection

¥2,160-17,280
RETZ ENERGY OJSC 🇷🇺
Voltage Transformers NOL(P)-SVEL for Signal Transmission

Voltage Transformers NOL(P)-SVEL for Signal Transmission

¥648-12,960
SVEL Group OJSC 🇷🇺
Grounded Voltage Transformer NOL-EK MN10

Grounded Voltage Transformer NOL-EK MN10

¥6,480-25,920
ELECTROSHIT-K° LLC 🇷🇺
Non-Earthing Voltage Transformer NOL-NTZ-15(20)-IV

Non-Earthing Voltage Transformer NOL-NTZ-15(20)-IV

¥6,480-25,920
NTZ VOLKHOV LLC 🇷🇺
Grounding Voltage Transformer ZNOL-EC M2

Grounding Voltage Transformer ZNOL-EC M2

¥648-3,888
ELECTROSHIT-K° LLC 🇷🇺
Grounding Voltage Transformers ZNOLP-6(10) kV

Grounding Voltage Transformers ZNOLP-6(10) kV

¥1,080-3,888
SZTT OJSC 🇷🇺
Single-Phase Antiresonant Voltage Transformer NAM-500 UHL1

Single-Phase Antiresonant Voltage Transformer NAM-500 UHL1

¥64,800-216,000
RETZ ENERGY OJSC 🇷🇺
Anti-Resonance Voltage Transformer NALI-NTZ

Anti-Resonance Voltage Transformer NALI-NTZ

¥648-4,320
NTZ VOLKHOV LLC 🇷🇺
Non-Earthed Voltage Transformers NOL-20, NOL-35

Non-Earthed Voltage Transformers NOL-20, NOL-35

¥648-2,592
SZTT OJSC 🇷🇺
Grounded Voltage Transformer NOL-EK M3

Grounded Voltage Transformer NOL-EK M3

¥648-4,320
ELECTROSHIT-K° LLC 🇷🇺
Voltage Measuring Transformers ZNG-UETM®-500 for Electrical Equipment

Voltage Measuring Transformers ZNG-UETM®-500 for Electrical Equipment

¥64,800-259,200
ELMAS (UETM) LLC 🇷🇺
Three-Phase Antiresonant Voltage Transformers NALI-EC-35 MN40

Three-Phase Antiresonant Voltage Transformers NALI-EC-35 MN40

¥21,600-129,600
ELECTROSHIT-K° LLC 🇷🇺
Capacitive Voltage Transformer NDKM Series

Capacitive Voltage Transformer NDKM Series

¥64,800-432,000
RETZ ENERGY OJSC 🇷🇺
High Voltage Measuring Transformer ZNG-UETM®-110 up to 16 kVA

High Voltage Measuring Transformer ZNG-UETM®-110 up to 16 kVA

¥21,600-129,600
ELMAS (UETM) LLC 🇷🇺
Grounding Voltage Transformers ZNOL-35 III

Grounding Voltage Transformers ZNOL-35 III

¥6,480-21,600
SZTT OJSC 🇷🇺
High Voltage Measuring Transformers ZNG-UETM®-220, up to 16 kVA

High Voltage Measuring Transformers ZNG-UETM®-220, up to 16 kVA

¥64,800-259,200
ELMAS (UETM) LLC 🇷🇺
Anti-Resonant Three-Phase Voltage Transformer NAM-10-95 UHL2

Anti-Resonant Three-Phase Voltage Transformer NAM-10-95 UHL2

¥6,480-25,920
RETZ ENERGY OJSC 🇷🇺
Grounded Voltage Transformer ZNOLP-EK M2

Grounded Voltage Transformer ZNOLP-EK M2

¥1,296-12,960
ELECTROSHIT-K° LLC 🇷🇺
Grounding Voltage Transformer ZNOL-EC M1

Grounding Voltage Transformer ZNOL-EC M1

¥648-3,888
ELECTROSHIT-K° LLC 🇷🇺
Gas-Filled Inductive Voltage Transformer ZNOG-220

Gas-Filled Inductive Voltage Transformer ZNOG-220

¥64,800-216,000
ZETO CJSC 🇷🇺
Laboratory Voltage Transformers NLL-6, NLL-10, NLL-35-6

Laboratory Voltage Transformers NLL-6, NLL-10, NLL-35-6

¥648-4,320
SZTT OJSC 🇷🇺
Capacitive Voltage Transformer NDKM-220 UHL1

Capacitive Voltage Transformer NDKM-220 UHL1

¥64,800-216,000
RETZ ENERGY OJSC 🇷🇺

常见问题

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.