Control Valves & Actuators
Industrial Switches & Gateways
Monitoring & Diagnostic Systems
Building Systems Controllers (Access, Fire, Lighting, Elevators)
SCADA & DCS Control Systems
PLCs, Controllers & Control Units
Industrial Connectors & Contacts
Electronics Educational Kits
Elevator Control Systems
Operator Panels & HMI
Other Industrial Automation
产品 — 工业自动化
Automatic Transfer Switch Panel for Backup Power with Distribution and Dispatching, IP54, 500x650x220mm
¥3,024-12,960
INTELLECTRO LLC 🇷🇺
Charge Controller GВ/T BFMI.468362.033-01 for Efficient Energy Management
¥648-2,592
GLOBUS RKB OJSC 🇷🇺
Control Block for Preventing Unauthorized Engine Shutdown on Locomotives KON NKRМ.468242.003-05
¥648-2,592
NEUROKOM OJSC 🇷🇺
Safety Control Unit for Preventing Unauthorized Shutdowns on Locomotives KON NKRМ.468242.003-01
¥1,080-3,456
NEUROKOM OJSC 🇷🇺
Multifunctional Programmable Controller for Distributed Control Systems Elicont-1200
¥6,480-25,920
ELARA OJSC 🇷🇺
Control Handle Adapter for Grain Harvester Information Processing ATV-L.426471.025
¥1,080-3,456
ATI LLC 🇷🇺
Wastewater Vacuum System Control Panel for Efficient Waste Management BUK-1
¥6,480-25,920
YAMYA-ENGINEERING LLC 🇷🇺
Autonomous Power Supply Control Unit for AЭС-40 Systems PMU-40-1
¥6,480-25,920
Electropribor OJSC 🇷🇺
Autonomous Power Supply Control Unit for Efficient Energy Management PMU-2
¥6,480-21,600
Electropribor OJSC 🇷🇺
Electric Power Control and Protection Unit for 220V Systems BRZU-220V
¥6,480-25,920
Electropribor OJSC 🇷🇺
Control Unit for Current Distribution and Protection in Anti-Icing Systems BUPT5M
¥2,160-12,960
Electropribor OJSC 🇷🇺
Multi-Channel Monitoring System for Temperature, Pressure, and More MSC
¥43,200-864,000
MORINSIS-AGAT-KIP OJSC 🇷🇺
Automated Control Systems for Technological Processes according to GOST Standards
¥216,000-4,320,000
INSIGHT LLC 🇷🇺
Pressure Distribution Manifold for Technological Water Supply T-BG
¥64,800-216,000
Technovek Oil and Gas Equipment Plant LLC 🇷🇺
ATS-01 Train Control Unit for 81-765 Metro Model
¥21,600-86,400
V.V. Tikhomirov Research Institute of Instrument Engineering OJSC 🇷🇺
Automatic Control System for Gas Distribution Station SAU GRS
¥64,800-432,000
OilGasEquipment LLC 🇷🇺
Data Exchange Control Module Set for Object Controllers OK-EL Type 4 (EK)
¥6,480-21,600
EXPERTSTROYPROEKT LLC 🇷🇺
Antenna Coordination and Control Unit (BCKA) for Emergency Notification System SUBR-1P
¥648-2,592
URALTECHIS LLC 🇷🇺
Linear Telemechanics Cabinet (ШТМ) for Oil Pipeline Management
¥21,600-129,600
Transneft Automation and Metrology OJSC 🇷🇺
常见问题
•Can Russian PLCs replace Western controllers in an existing plant?
Frequently yes, at the controller level: standard IEC 61131-3 programming, Modbus and OPC UA support, and familiar I/O module structures make migration a normal engineering task rather than a redesign. Vendors will review your existing signal list and program structure, then state what ports directly and what needs adaptation, before you commit.
•Is the programming software available in English?
Major vendors ship development environments with English interfaces and documentation; some smaller ones offer English manuals with Russian-language tooling. Confirm language support for the specific product line when requesting a quote, and ask for a trial licence — most vendors provide evaluation versions so your engineers test the workflow first.
•How is technical support delivered to buyers abroad?
Standard practice is remote: email and messenger support from the vendor's engineers, screen-sharing sessions for commissioning, and firmware updates by download. For larger projects, paid on-site commissioning visits are negotiable. Agree response times and a support contact in the contract — vendors here are used to supporting industrial customers directly.
•What about cybersecurity and update policies for SCADA systems?
Vendors document update channels and provide signed firmware; many systems are designed for isolated or air-gapped networks, reflecting Russian industrial practice. Ask for the security architecture description and update policy as part of the tender file, and verify compatibility with your national requirements for critical infrastructure software before deployment.
•Can I start with a pilot before committing to a plant-wide rollout?
Yes, and vendors encourage it. A typical pilot is one controller with representative I/O and the development environment, shipped by air courier within 2–3 weeks. Vendors usually support the pilot intensively, since it is their main path to winning the full project. Pilot pricing is often close to list, with project discounts applied at rollout.