Control Valves & Actuators
Industrial Switches & Gateways
Monitoring & Diagnostic Systems
Building Systems Controllers (Access, Fire, Lighting, Elevators)
SCADA & DCS Control Systems
PLCs, Controllers & Control Units
Industrial Connectors & Contacts
Electronics Educational Kits
Elevator Control Systems
Operator Panels & HMI
Other Industrial Automation
产品 — 工业自动化
Signal Control Unit for Pressure Sensors PU2-CAUT-CM/485
¥648-2,592
Federal State Unitary Enterprise "Production Association "OKTYABR" 🇷🇺
Train Control On-Board Computers (BKPUs)
¥64,800-259,200
V.V. Tikhomirov Research Institute of Instrument Engineering OJSC 🇷🇺
Argus Measurement and Control Software-Hardware Complex (PTK Argus)
¥21,600-129,600
LLC "NPF "PERSPEKTIVA" 🇷🇺
Digital Platforms with Electromechanical Transmission Series CP EMT
¥21,600-129,600
RESONANCE LLC 🇷🇺
Automatic Reserve Switchboard SHAVR – AVR Functionality
¥1,296-12,960
ENELT Production Company LLC 🇷🇺
NIKS-24 Controller for Automated DC Outdoor Lighting Management - Model NIKS 24-A
¥6,480-25,920
MSU LLC 🇷🇺
Relay Object Controller Management Module Set OK-EL Type 3 (EK)
¥6,480-21,600
EXPERTSTROYPROEKT LLC 🇷🇺
Protective Panel for TITAN and SMART Distribution Boards YKV-PL-G-36-45-1-0
¥8.64-34.56
IEK Holding LLC 🇷🇺
Industrial Programmable Controller ELSI-TMK Module TN 713 2 COM 921
¥648-2,160
Elesi PSA Plant LLC 🇷🇺
Centralized Control Unit for Electric Sirens BUS-1 [GBNK.468331.001]
¥1,296-6,048
Tomsk State University of Control Systems and Radioelectronics (TUSUR) 🇷🇺
常见问题
•Can Russian PLCs replace Western controllers in an existing plant?
Frequently yes, at the controller level: standard IEC 61131-3 programming, Modbus and OPC UA support, and familiar I/O module structures make migration a normal engineering task rather than a redesign. Vendors will review your existing signal list and program structure, then state what ports directly and what needs adaptation, before you commit.
•Is the programming software available in English?
Major vendors ship development environments with English interfaces and documentation; some smaller ones offer English manuals with Russian-language tooling. Confirm language support for the specific product line when requesting a quote, and ask for a trial licence — most vendors provide evaluation versions so your engineers test the workflow first.
•How is technical support delivered to buyers abroad?
Standard practice is remote: email and messenger support from the vendor's engineers, screen-sharing sessions for commissioning, and firmware updates by download. For larger projects, paid on-site commissioning visits are negotiable. Agree response times and a support contact in the contract — vendors here are used to supporting industrial customers directly.
•What about cybersecurity and update policies for SCADA systems?
Vendors document update channels and provide signed firmware; many systems are designed for isolated or air-gapped networks, reflecting Russian industrial practice. Ask for the security architecture description and update policy as part of the tender file, and verify compatibility with your national requirements for critical infrastructure software before deployment.
•Can I start with a pilot before committing to a plant-wide rollout?
Yes, and vendors encourage it. A typical pilot is one controller with representative I/O and the development environment, shipped by air courier within 2–3 weeks. Vendors usually support the pilot intensively, since it is their main path to winning the full project. Pilot pricing is often close to list, with project discounts applied at rollout.