Башка
Локерлер жана раздевалка шкафтары
Залдар үчүн креслолар
Абоненттик шкафтар
Күтүү жайынын стойкалары
Күтүү жайынын скамьялары
Гезит шкафтары
Күтүү жайы үчүн жумшак эмерек
Бөлүштүү жана бүктөлгөн креслолор
Тоскоолдор жана коргондор
Китепкана стеллаждары
Жер жана дубал илгичтери
Көргөзмө витриналары
Маалымат стенддери
Добуш берүү жана касса кабиналары
Спорт отургучтары
Трибуналар жана кафедралар
Хореография станоктору
Товарлар — Коомдук жайлардын эмерек
Comfortable Auditorium Chair with Elastic Foam Padding Horatius Model
сом 13,050-46,980
OPTSNAB LLC 🇷🇺
Soft Upholstered Auditorium Chair with Metal Frame and Armrests "Mega
сом 7,830-26,100
OPTSNAB LLC 🇷🇺
Theater Seating Chair with Classic Design and Silent Return Mechanism Leonard Model
сом 7,830-26,100
OPTSNAB LLC 🇷🇺
Comfortable Theatre Chair with Metal Frame for Auditoriums Solo Model
сом 7,830-26,100
OPTSNAB LLC 🇷🇺
Versatile Puff Seating with Metal Frame for Offices and Institutions by Edelwood
сом 1,827-7,308
NMC LLC 🇷🇺
Enhanced Three-Seat Auditorium Chair for Theaters and Conference Halls KR-01.00.24x3
сом 13,050-46,980
KANSAS LLC 🇷🇺
FAQ
•Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
•Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
•How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
•What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
•Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.