Товарлар — Өнөр жай автоматташтыруу
Модуль БУВ 775
сом 261,000-1,044,000
V.V. Tikhomirov Research Institute of Instrument Engineering OJSC 🇷🇺
Control Unit for Vibration Stand IYAEL4.137.061 TU AO "TulatocheMash" Russia
сом 261,000-1,566,000
TULATOCHMAS OJSC 🇷🇺
Автоматташтырылган башкаруу системасы «Неман-Р-КЦ»
сом 2,610,000-15,660,000
PJSC GAZPROM AUTOMATION 🇷🇺
Өнөр жай контроллер ПК «Стабур» 19 телекоммуникация шкафтары үчүн
сом 78,300-313,200
PROMSVYAZ LLC 🇷🇺
Remote Control and Monitoring System for Electromechanical Locking Devices EMZU
сом 7,830-31,320
CESIS OJSC 🇷🇺
Пульт управления грунтозабором Оң борт. ПУГ ПрБ (МНН.Ц480М2рД/НФ.360066.021)
сом 78,300-313,200
MARINEK-NN LLC 🇷🇺
Diktofon miniatyurnyy stereofonicheskiy «Gnom-Siti» STC-H788 ЦВАУ.467669.052
сом 2,610-15,660
CRT LLC 🇷🇺
FAQ
•Can Russian PLCs replace Western controllers in an existing plant?
Frequently yes, at the controller level: standard IEC 61131-3 programming, Modbus and OPC UA support, and familiar I/O module structures make migration a normal engineering task rather than a redesign. Vendors will review your existing signal list and program structure, then state what ports directly and what needs adaptation, before you commit.
•Is the programming software available in English?
Major vendors ship development environments with English interfaces and documentation; some smaller ones offer English manuals with Russian-language tooling. Confirm language support for the specific product line when requesting a quote, and ask for a trial licence — most vendors provide evaluation versions so your engineers test the workflow first.
•How is technical support delivered to buyers abroad?
Standard practice is remote: email and messenger support from the vendor's engineers, screen-sharing sessions for commissioning, and firmware updates by download. For larger projects, paid on-site commissioning visits are negotiable. Agree response times and a support contact in the contract — vendors here are used to supporting industrial customers directly.
•What about cybersecurity and update policies for SCADA systems?
Vendors document update channels and provide signed firmware; many systems are designed for isolated or air-gapped networks, reflecting Russian industrial practice. Ask for the security architecture description and update policy as part of the tender file, and verify compatibility with your national requirements for critical infrastructure software before deployment.
•Can I start with a pilot before committing to a plant-wide rollout?
Yes, and vendors encourage it. A typical pilot is one controller with representative I/O and the development environment, shipped by air courier within 2–3 weeks. Vendors usually support the pilot intensively, since it is their main path to winning the full project. Pilot pricing is often close to list, with project discounts applied at rollout.