محصولات — لوله ها ، اتصالات و اتصالات انبساطی
Flexible Bellows Expansion Joint Type L, LFK, Nominal Diameter 15mm to 5000mm, Pressure Rating 0
﷼ 37,800,000-756,000,000
VITTSEMAN LLC 🇷🇺
Dual-Section Bellows Compensating Device with Thermal and Hydraulic Insulation 2СКУ.ППУ-ТПЭ
﷼ 8,820,000-35,280,000
HORTUM LLC 🇷🇺
Steel Welded Pipes with Polyurethane Insulation, 15.0-133.0 mm Diameter
﷼ 378,000-1,512,000
Saivehot LLC 🇷🇺
Two-Section Compensating Device with Insulated Bellows 2СКУ.ППМ
﷼ 37,800,000-151,200,000
HORTUM LLC 🇷🇺
KS PW - Joint Type Rotating Bellows Compensator DN 32-1200mm, 16 & 25 Bar
﷼ 12,600,000-252,000,000
HORTUM LLC 🇷🇺
Pipeline Cover Made of Polyester Fiberglass - Model 5299-40-8119012
﷼ 378,000-1,512,000
AVTOPLAST LLC 🇷🇺
Fixed Support with Threaded Connection for Water Supply NO.V.R DN 50-100 (Stainless Steel, Galvanized)
﷼ 378,000-1,512,000
HORTUM LLC 🇷🇺
Fixed Support for Groove Connection for Water Supply NO.V.Gr DN 25-40 (Stainless Steel)
﷼ 126,000-756,000
HORTUM LLC 🇷🇺
Universal Bellow Compensator KSU with Straps, DN 65-1200mm, 16 & 25 Bar
﷼ 37,800,000-756,000,000
HORTUM LLC 🇷🇺
Pipeline Assembly Connectors for Branching and Diameter Transition (OST 1 00993-91)
﷼ 126,000-2,520,000
AEROTECH LLC 🇷🇺
High-Temperature Tube Furnaces for Oil and Gas Heating
﷼ 1,260,000,000-25,200,000,000
PENZKHIMMAS LLC 🇷🇺
Two-Section Bellows Compensating Device with Thermal and Hydraulic Insulation 2СКУ.ППУ
﷼ 7,560,000-40,320,000
HORTUM LLC 🇷🇺
KSO-P/2-N Model 2 Bellows Compensator for Heating and Water Supply Systems (External Thread Stainless Steel); DN 15-50
﷼ 1,260,000-7,560,000
HORTUM LLC 🇷🇺
Pipe Connectors for Pipeline Branching and Transitions (GOST 13977-72)
﷼ 37,800-756,000
AEROTECH LLC 🇷🇺
Regulation-connecting device module RCU 4A 017-03 for adults, steel
﷼ 378,000-1,512,000
PJSC RKK Energia 🇷🇺
Flanged Shut-off Valve DN 150 PN 16 Series 458 (КМИА.491125.005)
﷼ 3,780,000-12,600,000
MEZON FT RUS LLC 🇷🇺
Digital Control System for Assembling Welded and Soldered Pipelines
﷼ 1,260,000,000-7,560,000,000
DIGITAL ASSEMBLY OJSC 🇷🇺
Universal Bellows Compensator UCK-4-500 for Marine Applications
﷼ 12,600,000-75,600,000
NPO KOMPENSATOR OJSC 🇷🇺
Pipeline Protection Device Against Induced AC Current TU 3435-005-93719333-2010
﷼ 37,800,000-126,000,000
PIPE SYSTEMS AND TECHNOLOGIES OJSC 🇷🇺
FAQ
•Do Russian flanges fit EN or ASME piping systems?
GOST flange dimension tables largely parallel EN 1092, and many sizes interchange directly; ASME B16.5 patterns differ and require either an adapter spool or flanges machined to the ASME drilling. State the standard your plant uses and suppliers will either confirm interchangeability or machine to your template — both are routine requests.
•Can expansion joints be engineered for my specific pipeline?
Yes. For bellows and fabric compensators you provide diameter, pressure, temperature, medium and expected axial or lateral movement. The manufacturer calculates the bellows geometry, selects the steel grade and returns a datasheet with cycle life. Custom units in non-catalogue diameters are normal production, typically within 20–35 days.
•What pressure documentation comes with fittings and flanges?
Each batch ships with material certificates stating steel grade and heat number, hydraulic or pneumatic test protocols where applicable, and EAC conformity documents. For critical service, additional ultrasonic or radiographic weld inspection can be ordered and documented — specify the inspection level in your request for quotation.
•What is the minimum order for brass and small-bore fittings?
Small fittings are sold by carton — usually 50–500 pieces per SKU depending on size. Distributors typically assemble mixed pallets across dozens of positions, and suppliers will consolidate several product families into one container so you reach economical freight without overstocking any single item.
•How fast can a mixed piping order reach Central Asia or the Gulf?
Stock items dispatch within about a week. Trucked cargo reaches Tashkent or Almaty in 7–14 days door to door. Sea freight from Novorossiysk to Jebel Ali typically runs 20–35 days including port handling. Custom-machined items add their production time, so split urgent stock lines from engineered positions when ordering.