محصولات — تأمین و توزیع برق

Sealed Lead-Acid Battery SГАН(ф)12-30

Sealed Lead-Acid Battery SГАН(ф)12-30

﷼ 882,000-2,520,000
ISTOCHNIK LLC 🇷🇺
Sealed Lead-Acid Battery SGAN12-9

Sealed Lead-Acid Battery SGAN12-9

﷼ 378,000-1,260,000
ISTOCHNIK LLC 🇷🇺
Sealed Lead-Acid Battery SГАН2-800

Sealed Lead-Acid Battery SГАН2-800

﷼ 1,512,000-4,032,000
ISTOCHNIK LLC 🇷🇺
Sealed Lead-Acid Battery SGAN12-55

Sealed Lead-Acid Battery SGAN12-55

﷼ 1,134,000-3,024,000
ISTOCHNIK LLC 🇷🇺
Sealed Lead-Acid Gel Battery with Armor Electrode SGG2-1000

Sealed Lead-Acid Gel Battery with Armor Electrode SGG2-1000

﷼ 6,300,000-17,640,000
ISTOCHNIK LLC 🇷🇺
Sealed Lead-Acid Gel Battery SGGN12-125

Sealed Lead-Acid Gel Battery SGGN12-125

﷼ 1,134,000-3,528,000
ISTOCHNIK LLC 🇷🇺
باتری سرب-اسید مهر و موم شده SGAN12-8.5

باتری سرب-اسید مهر و موم شده SGAN12-8.5

﷼ 630,000-1,764,000
ISTOCHNIK LLC 🇷🇺
باتری سرب-اسید مهر و موم شده SGAN12-150

باتری سرب-اسید مهر و موم شده SGAN12-150

﷼ 1,134,000-3,024,000
ISTOCHNIK LLC 🇷🇺
باتری سرب-اسید مهر و موم شده SGAN(f)12-180A

باتری سرب-اسید مهر و موم شده SGAN(f)12-180A

﷼ 3,780,000-12,600,000
ISTOCHNIK LLC 🇷🇺
باتری سربی-اسیدی مهر و موم شده SGAN2-500

باتری سربی-اسیدی مهر و موم شده SGAN2-500

﷼ 1,260,000-3,528,000
ISTOCHNIK LLC 🇷🇺

FAQ

•Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
•What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
•How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
•Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
•Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
•What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.