محصولات — تأمین و توزیع برق

Throttle Transformer DTE-0.6-1000 for Railway Electrification

Throttle Transformer DTE-0.6-1000 for Railway Electrification

﷼ 37,800,000-126,000,000
ELTEZA OJSC 🇷🇺
Signal Transformer DTE-0.2-1500 for Railway Automation

Signal Transformer DTE-0.2-1500 for Railway Automation

﷼ 3,780,000-12,600,000
ELTEZA OJSC 🇷🇺
Throttle Transformer DTE-0.6-500 (n=15)

Throttle Transformer DTE-0.6-500 (n=15)

﷼ 17,640,000-75,600,000
ELTEZA OJSC 🇷🇺
Throttle Transformer DTE-0.2-1000 (n=23)

Throttle Transformer DTE-0.2-1000 (n=23)

﷼ 18,900,000-75,600,000
ELTEZA OJSC 🇷🇺
AC Choke Transformers DT-1MG2-300 for Railway Automation

AC Choke Transformers DT-1MG2-300 for Railway Automation

﷼ 3,780,000-12,600,000
ELTEZA OJSC 🇷🇺
Throttle Transformer DTE-0.6-500 (n=3) for Railway Applications

Throttle Transformer DTE-0.6-500 (n=3) for Railway Applications

﷼ 37,800,000-126,000,000
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer PRT-G

Dry Single-Phase Transformer PRT-G

﷼ 378,000-1,512,000
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer PT-25G-1

Dry Single-Phase Transformer PT-25G-1

﷼ 630,000-2,520,000
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer ST-4M

Dry Single-Phase Transformer ST-4M

﷼ 378,000-1,512,000
ELTEZA OJSC 🇷🇺
Signal Transformer DTE-0.2-1500CN for Railway Automation

Signal Transformer DTE-0.2-1500CN for Railway Automation

﷼ 3,780,000-12,600,000
ELTEZA OJSC 🇷🇺
Throttle Transformer DTE-0.6-1000 for Railway Applications

Throttle Transformer DTE-0.6-1000 for Railway Applications

﷼ 37,800,000-126,000,000
ELTEZA OJSC 🇷🇺
AC Choke Transformer DT-1MG2-450 for Signal Devices

AC Choke Transformer DT-1MG2-450 for Signal Devices

﷼ 12,600,000-75,600,000
ELTEZA OJSC 🇷🇺

Post your Buy Requirement

Get Quotes from Verified Suppliers

در زمان خود صرفه‌جویی کنید
AC Current Choke Transformers DT-1MG1-450

AC Current Choke Transformers DT-1MG1-450

﷼ 18,900,000-75,600,000
ELTEZA OJSC 🇷🇺
DTE-0.2-1500 Choke Transformer for Railway Automation

DTE-0.2-1500 Choke Transformer for Railway Automation

﷼ 3,780,000-12,600,000
ELTEZA OJSC 🇷🇺
Single-Phase Sealed Transformer POBS-3G

Single-Phase Sealed Transformer POBS-3G

﷼ 630,000-2,520,000
ELTEZA OJSC 🇷🇺
Dry Single Phase Transformer ST-4G

Dry Single Phase Transformer ST-4G

﷼ 378,000-1,512,000
ELTEZA OJSC 🇷🇺
Sealed Single-Phase Transformer ST-5G

Sealed Single-Phase Transformer ST-5G

﷼ 630,000-2,520,000
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer POBC-2G

Dry Single-Phase Transformer POBC-2G

﷼ 1,260,000-7,560,000
ELTEZA OJSC 🇷🇺
AC Choke-Transformers DT-1MG2-150 for Railway Signal Systems

AC Choke-Transformers DT-1MG2-150 for Railway Signal Systems

﷼ 3,780,000-12,600,000
ELTEZA OJSC 🇷🇺
Dry Single-Phase Transformer ST-4P3M

Dry Single-Phase Transformer ST-4P3M

﷼ 378,000-1,512,000
ELTEZA OJSC 🇷🇺
DC-AC Choke Transformer DTE-0.2-500 (n=23)

DC-AC Choke Transformer DTE-0.2-500 (n=23)

﷼ 37,800,000-126,000,000
ELTEZA OJSC 🇷🇺
ترانسفورماتور خشک تک فاز PTM –G

ترانسفورماتور خشک تک فاز PTM –G

﷼ 630,000-2,520,000
ELTEZA OJSC 🇷🇺
ترانسفورماتور خشک تک فاز PT-25M-2

ترانسفورماتور خشک تک فاز PT-25M-2

﷼ 630,000-2,520,000
ELTEZA OJSC 🇷🇺
ترانسفورماتور دما-0,4-1500س (n=3)

ترانسفورماتور دما-0,4-1500س (n=3)

﷼ 3,780,000-15,120,000
ELTEZA OJSC 🇷🇺
ترانسفورماتورهای چوک AC 2DT-1MG1-300

ترانسفورماتورهای چوک AC 2DT-1MG1-300

﷼ 3,780,000-15,120,000
ELTEZA OJSC 🇷🇺

FAQ

•Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
•What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
•How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
•Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
•Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
•What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.