ترانسفورماتورهای قدرت
ترانس جریان (CT)
ترانس ولتاژ (VT)
ترانسفورماتورهای ویژه
یو پی اس (UPS)
استابلایزر ولتاژ
منبع تغذیه و ماژول
مبدل، اینورتر و یکسوساز
درایو فرکانس متغیر (VFD)
ترانسدیوسر اندازهگیری
تابلوهای توزیع KRU و NKU
پستهای ترانسفورماتور پیشساخته (KTP)
باتری استارت خودرو
باتری ثابت و لیتیوم یونی
نیروگاه خورشیدی و پنل فتوولتاییک
سیستمهای تأمین برق و DC اضطراری
منبع تغذیه پشتیبان (BBP)
پریز و کلون قدرت
شارژر خودروی برقی
سایر
محصولات — تأمین و توزیع برق
Power Distribution Electrical Panel for Vehicles AMFE.383644.400-01
﷼ 6,300,000-22,680,000
METTEM-M LLC 🇷🇺
Remote Power Supply Equipment P-317 ADP
﷼ 37,800,000-252,000,000
Derbent Scientific Research Institute "Volna" OJSC 🇷🇺
Power Supply for Low Temperature Evaporators up to 1 kW, Four-Channel
﷼ 63,000,000-201,600,000
LVT+ LLC 🇷🇺
EF Power Supply Module 1AC/24DC-1 for Industrial Automation
﷼ 1,512,000-6,300,000
Elesi PSA Plant LLC 🇷🇺
High Voltage Power Supply for Capacitor Charging 700C-010-220-04-R
﷼ 126,000,000-504,000,000
OPTOSISTEMY LLC 🇷🇺
Power Supply for Locomotive Electronic Equipment IP-LE-50/200-50C
﷼ 6,300,000-22,680,000
NVP OJSC 🇷🇺
Power Supply Module for Industrial Automation EF 24DC/24DC-0.05-4
﷼ 3,780,000-12,600,000
Elesi PSA Plant LLC 🇷🇺
High Voltage Power Supply SHVMP - 1kV to 60kV for Rack Mounting
﷼ 37,800,000-756,000,000
PARAMERUS LLC 🇷🇺
رگولاتور میکروپروسسوری کنترل واحدهای تغذیه الکترواستاتیک MEFIS-03
﷼ 37,800,000-151,200,000
RETZ ENERGY OJSC 🇷🇺
ماژول های منبع تغذیه پشتیبان سیستم اعلام صوتی خودکار RECHOR MRP-07, MRP-14
﷼ 6,300,000-20,160,000
RUSSBYT LLC 🇷🇺
Stable Power Supply for Locomotive Electronic Equipment IP-LE-110/110-400х1 06B.03.00.00-01
﷼ 12,600,000-50,400,000
GORIZONT LLC 🇷🇺
FAQ
•Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
•What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
•How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
•Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
•Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
•What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.