Products — Industrial Components

High-Pressure Turbine Cylinder Assembly with Control Valves

High-Pressure Turbine Cylinder Assembly with Control Valves

US$42,000-180,000
Maximum scope of modernization: in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
Maximum scope of modernization: in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
UTZ OJSC 🇷🇺
High-Pressure Cylinder Upgrade Kit for T-100 Steam Turbine

High-Pressure Cylinder Upgrade Kit for T-100 Steam Turbine

US$90,000-600,000
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
Steam Turbine Modernization Kit T-100

Steam Turbine Modernization Kit T-100

US$60,000-600,000
Minimum scope of modernization: modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
T-60/66-10.2 Steam Turbine - Single-Cylinder Design

T-60/66-10.2 Steam Turbine - Single-Cylinder Design

US$900,000-3,000,000
Rated power: 66
Maximum heat load: 143
UTZ OJSC 🇷🇺
Steam Turbine P-50-12.8/0.8

Steam Turbine P-50-12.8/0.8

US$90,000-360,000
Fresh steam consumption: 330
Fresh steam pressure: 12.8
UTZ OJSC 🇷🇺
Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

Steam Turbine T-185/220-12.8-NG - 3-Cylinder Model

US$900,000-3,000,000
Maximum power: 220
Pressure: 12.8
UTZ OJSC 🇷🇺
TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator

TP-124-12.8-NG Steam Turbine - Three-Cylinder Power Generator

US$1,500,000-4,800,000
Rated power: 124.9
Nominal fresh steam flow rate: 524
UTZ OJSC 🇷🇺
Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

Steam Turbine PT-150/160-12.8 - Dual Cylinder Model

US$1,500,000-4,800,000
Rated power: 150
Maximum condensing power: 160
UTZ OJSC 🇷🇺
High-Pressure Turbine Cylinder Assembly T-250 with Stop Valve

High-Pressure Turbine Cylinder Assembly T-250 with Stop Valve

US$90,000-360,000
Maximum scope of modernization: in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
Maximum scope of modernization: in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
UTZ OJSC 🇷🇺
High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade

High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade

US$90,000-600,000
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine

High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine

US$90,000-600,000
Minimum scope of modernization: modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

US$90,000-300,000
Rated/maximum power: 88.4
Fresh steam pressure: 7.64
UTZ OJSC 🇷🇺

Post your Buy Requirement

Get Quotes from Verified Suppliers

Save Your Time
Steam Turbine R-50-12.8/1.5 for Power Generation

Steam Turbine R-50-12.8/1.5 for Power Generation

US$90,000-300,000
Assignment: for electricity and steam generation
Assignment: for electricity and steam generation
UTZ OJSC 🇷🇺
Steam Turbine T-120/130-12.8-NG for Industrial Applications

Steam Turbine T-120/130-12.8-NG for Industrial Applications

US$1,500,000-4,800,000
Rated power: 120
Steam consumption: 540
UTZ OJSC 🇷🇺