产品 — 公共空间家具

Magazine Storage Unit with 10 Cells

Magazine Storage Unit with 10 Cells

¥648-2,160
DOGGER LLC 🇷🇺
15-Cell Magazine Storage Unit with Display Functionality

15-Cell Magazine Storage Unit with Display Functionality

¥1,080-3,024
DOGGER LLC 🇷🇺
Periodical Publications Storage Unit

Periodical Publications Storage Unit

¥648-2,592
DOGGER LLC 🇷🇺
Modular Storage Unit with 18 Compartments, 2-Module Design

Modular Storage Unit with 18 Compartments, 2-Module Design

¥1,080-3,456
DOGGER LLC 🇷🇺
Rotating Magazine Rack with 20 Compartments

Rotating Magazine Rack with 20 Compartments

¥6,480-21,600
DOGGER LLC 🇷🇺
Display Podium Stand for Exhibits and Seating

Display Podium Stand for Exhibits and Seating

¥648-4,320
DOGGER LLC 🇷🇺
Vertical Display Showcase Type EO

Vertical Display Showcase Type EO

¥3,024-21,600
DOGGER LLC 🇷🇺
Customizable Information Stand with LED Lighting Options

Customizable Information Stand with LED Lighting Options

¥129.60-1,296
DOGGER LLC 🇷🇺
Horizontal Display Showcase Type EO

Horizontal Display Showcase Type EO

¥3,240-21,600
DOGGER LLC 🇷🇺

常见问题

Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.