المنتجات — إمدادات الطاقة والتوزيع

Digital Position Indicators for Power Transformers RPN with Signal Conversion

مؤشرات موضع رقمية لمحولات الطاقة RPN مع تحويل الإشارة

SAR 562.50-2,025
ش.م "إليكتروپريبور 🇷🇺
Digital Indicator for Load Tap Changer Position of Power Transformers SHUP120

مؤشر رقمي لموقع محول التحميل لمحول الطاقة SHUP120

SAR 675-2,700
ش.م "إليكتروپريبور 🇷🇺
AC Current and Voltage Measuring Converter E1854EL

محول قياس التيار والجهد المتردد E1854EL

SAR 337.50-1,125
ش.م "إليكتروپريبور 🇷🇺
AC Frequency Measurement Converter E1858EL

محول قياس تردد التيار المتردد E1858EL

SAR 337.50-1,125
ش.م "إليكتروپريبور 🇷🇺
DC and AC Voltage and Current Measurement Converter E856EL

محول قياس التيار والجهد المستمر والمتناوب: E856EL

SAR 337.50-1,350
ش.م "إليكتروپريبور 🇷🇺
DC Current and Voltage Measurement Converter for Electrical Systems E1856EL

محول قياس التيار والجهد المستمر للأنظمة الكهربائية E1856EL

SAR 337.50-1,125
ش.م "إليكتروپريبور 🇷🇺
Measurement Converter for AC Electrical Parameters E900EL

محول قياس للمعلمات الكهربائية المتناوبة E900EL

SAR 562.50-2,025
ش.م "إليكتروپريبور 🇷🇺
Three-Channel AC Current and Voltage Measuring Converter E3854EL

محول قياس التيار والجهد المتردد ثلاثي القنوات E3854EL

SAR 337.50-1,125
ش.م "إليكتروپريبور 🇷🇺
Power Supply Unit for Digital Devices +5V Compact BPI5-1

وحدة تزويد الطاقة للأجهزة الرقمية +5 فولت مدمجة BPI5-1

SAR 11.25-67.50
ش.م "إليكتروپريبور 🇷🇺

الأسئلة الشائعة

•Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
•What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
•How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
•Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
•Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
•What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.