Тауарлар — Электр қуат және тарату

High-Frequency Blockers Series VZ

High-Frequency Blockers Series VZ

₸4,275,000-28,500,000
RETZ ENERGY OJSC 🇷🇺
Энергия жинақтаушы НЭ-1660-665-186,4

Энергия жинақтаушы НЭ-1660-665-186,4

₸4,275,000-17,100,000
MSA NPC LLC 🇷🇺
Электроқұрылғы жинағы ЭД4М, ЭП2ДМ

Электроқұрылғы жинағы ЭД4М, ЭП2ДМ

₸1,425,000-8,550,000
KSK SP LLC 🇷🇺
Жабық орындау бөлгіш құрылғылар ЗРУ 10(6) кВ

Жабық орындау бөлгіш құрылғылар ЗРУ 10(6) кВ

₸19,950,000-85,500,000
TITAN ENGINEERING LLC 🇷🇺
Current Transformer for Signal Transmission TSHLG-0.66

Current Transformer for Signal Transmission TSHLG-0.66

₸42,750-285,000
SZTT OJSC 🇷🇺
Low-Voltage Complete Devices "PROTON

Low-Voltage Complete Devices "PROTON

₸1,425,000-11,400,000
ENERGOSTAR LLC 🇷🇺
Complete Transformer Substations KTPB-SVEL for 35, 110, 220 kV

Complete Transformer Substations KTPB-SVEL for 35, 110, 220 kV

₸28,500,000-285,000,000
SVEL-POWER TRANSFORMERS LLC 🇷🇺
VKU330-2.000 Айналмалы байланыс құрылғысы

VKU330-2.000 Айналмалы байланыс құрылғысы

₸427,500-1,710,000
ELECTROMASHINA OJSC 🇷🇺
Arc Extinguishing Unit AZDPS 6 - 35kV 120-2000 kVA

Arc Extinguishing Unit AZDPS 6 - 35kV 120-2000 kVA

₸4,275,000-14,250,000
ENSONS LLC 🇷🇺

Energy Storage and Management System VOLTS VT 2.0

₸855,000-8,550,000
NLEMZ OJSC 🇷🇺
Laboratory Voltage Transformers NLL-15, NLL-35

Laboratory Voltage Transformers NLL-15, NLL-35

₸427,500-1,710,000
SZTT OJSC 🇷🇺
Equipment Set EVP-110-05 for Data Collection and Monitoring

Equipment Set EVP-110-05 for Data Collection and Monitoring

₸4,275,000-14,250,000
PTM LLC 🇷🇺
Arc Suppressing Unit AZDPM 6-35 kV 120-3150 kVA

Arc Suppressing Unit AZDPM 6-35 kV 120-3150 kVA

₸4,275,000-17,100,000
ENSONS LLC 🇷🇺
OWEL Comfort Electric Heating System C-160, C-90

OWEL Comfort Electric Heating System C-160, C-90

₸7,125-28,500
SECTOR ENERGY LLC 🇷🇺
Emergency DC Distribution Board 04580.9200.001

Emergency DC Distribution Board 04580.9200.001

₸427,500-1,710,000
VNIIPR-PROGRESS OJSC 🇷🇺
Жарықтық реттегіш

Жарықтық реттегіш

₸4,275,000-14,250,000
GOKB "PROZHEKTOR" OJSC 🇷🇺
Ceiling Power Supply System ST SEP-32(1)

Ceiling Power Supply System ST SEP-32(1)

₸427,500-2,850,000
SOYUZTEHNOLOGIYA LLC 🇷🇺
Complete Mining Transformer Substations KTP-RN

Complete Mining Transformer Substations KTP-RN

₸4,275,000-17,100,000
VOLTEKO LLC 🇷🇺
BRIT-90-220-1050/2000 KN Transformer Terminal Input

BRIT-90-220-1050/2000 KN Transformer Terminal Input

₸712,500-2,280,000
H ENERGY LLC 🇷🇺
Complete Pole-Type Transformer Substations (MTP, STP, SKTP)

Complete Pole-Type Transformer Substations (MTP, STP, SKTP)

₸855,000-8,550,000
ENERGOMASHSERVICE LLC 🇷🇺
Energy Consumption Optimizer OEP 3-200-01

Energy Consumption Optimizer OEP 3-200-01

₸427,500-1,710,000
VECTOR OJSC 🇷🇺
High Voltage Transformer Bushing BRIT-90-220-1050/2000 KN 2.9.005U

High Voltage Transformer Bushing BRIT-90-220-1050/2000 KN 2.9.005U

₸4,275,000-14,250,000
H ENERGY LLC 🇷🇺
Open High Voltage Input Device UVO-35

Open High Voltage Input Device UVO-35

₸4,275,000-14,250,000
KONTAKT OJSC 🇷🇺
Low Voltage Complete Device "Aurora

Low Voltage Complete Device "Aurora

₸1,425,000-8,550,000
IT SPB LLC 🇷🇺
Complete Transformer Power Explosion-Proof Substation KTSVP-UHL5-VV

Complete Transformer Power Explosion-Proof Substation KTSVP-UHL5-VV

₸42,750,000-171,000,000
ENERGIYA HOLDING OJSC 🇷🇺
Блоктық тарату станциясы (БТС)

Блоктық тарату станциясы (БТС)

₸4,275,000-17,100,000
HIGHTEK GROUP LLC 🇷🇺
Energy Storage System 24 kWh for Power Network Solutions

Energy Storage System 24 kWh for Power Network Solutions

₸7,125,000-22,800,000
URALELEMENT OJSC 🇷🇺
Electric Power System for Marine Use with 2 Diesel Generators

Electric Power System for Marine Use with 2 Diesel Generators

₸7,125,000-25,650,000
SIRMF LLC 🇷🇺
K-PANEL Low Voltage Complete Devices for Power Distribution

K-PANEL Low Voltage Complete Devices for Power Distribution

₸570,000-5,700,000
KRUS-WEST LLC 🇷🇺

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.