Тауарлар — Жылу алмастырғыштар мен жылу насостары

Oil Radiator for Hydraulic System TGM-28A.1013.100

Oil Radiator for Hydraulic System TGM-28A.1013.100

₸42,750-142,500
ORENBURG RADIATOR LLC 🇷🇺
Oil Cooler MBG for Turbine Systems

Oil Cooler MBG for Turbine Systems

₸427,500-1,710,000
PK BOILER LLC 🇷🇺
Oil Radiator for Hydraulic Systems OR-3000.1013.300

Oil Radiator for Hydraulic Systems OR-3000.1013.300

₸42,750-142,500
ORENBURG RADIATOR LLC 🇷🇺
Methanol Regeneration Column Evaporator Block 321-E-002/421-E-002

Methanol Regeneration Column Evaporator Block 321-E-002/421-E-002

₸7,125,000-28,500,000
KURGANHIMMASH LLC 🇷🇺
Plate Heat Exchanger Housing FP/PF 04

Plate Heat Exchanger Housing FP/PF 04

₸71,250-427,500
PALLANT ENGINEERING LLC 🇷🇺
Ducted Refrigerant Air Cooler Kanal-FKO

Ducted Refrigerant Air Cooler Kanal-FKO

₸171,000-855,000
VEZA LLC 🇷🇺
Air Conditioning System Heat Pump Training Stand VSK-TNKV

Air Conditioning System Heat Pump Training Stand VSK-TNKV

₸1,425,000-4,560,000
TRIMBIRT LLC 🇷🇺

Post your Buy Requirement

Get Quotes from Verified Suppliers

Уақытыңызды үнемдеңіз
Condensate Heating Block Heat Exchanger 300T-1/1 Black BRT-4.0

Condensate Heating Block Heat Exchanger 300T-1/1 Black BRT-4.0

₸4,275,000-14,250,000
KURGANHIMMASH LLC 🇷🇺
Engine Cooling Block for Komatsu PC1250-8, ONV

Engine Cooling Block for Komatsu PC1250-8, ONV

₸712,500-2,280,000
KEPM LLC 🇷🇺
Compact Air Filter FVKom for Dust Removal

Compact Air Filter FVKom for Dust Removal

₸4,275-28,500
PROFI FILTER LLC 🇷🇺
Compact W-Type Filter (FVKom-1)

Compact W-Type Filter (FVKom-1)

₸14,250-85,500
PROFI FILTER LLC 🇷🇺
T-4 Heat Exchanger Block BT-2.5-800-3 for Efficient Heating

T-4 Heat Exchanger Block BT-2.5-800-3 for Efficient Heating

₸712,500-2,850,000
KURGANHIMMASH LLC 🇷🇺
Air Heater Heat Exchanger NORDMATIC

Air Heater Heat Exchanger NORDMATIC

₸855,000-3,420,000
RZKO LLC 🇷🇺
Air Separation Unit for Liquid Nitrogen and Oxygen - KDON-140Y/160Y

Air Separation Unit for Liquid Nitrogen and Oxygen - KDON-140Y/160Y

₸42,750,000-142,500,000
COMGAS LLC 🇷🇺
Vertical Air Heater Heat Exchanger NORDMATIC VT-K 250 kW

Vertical Air Heater Heat Exchanger NORDMATIC VT-K 250 kW

₸1,995,000-7,125,000
RZKO LLC 🇷🇺
Compressed Air Oil Separator E-120/T

Compressed Air Oil Separator E-120/T

₸42,750-142,500
TRANSPNEVMATIKA OJSC 🇷🇺
Air Separation Unit for Nitrogen and Oxygen AzhKzh-0.07

Air Separation Unit for Nitrogen and Oxygen AzhKzh-0.07

₸19,950,000-71,250,000
NSK LLC 🇷🇺
Oven Stand RS7567H8S

Oven Stand RS7567H8S

₸71,250-228,000
RADAKS LLC 🇷🇺
Water and Alcohol Solution Filtration System

Water and Alcohol Solution Filtration System

₸712,500-2,850,000
KOROLAN LLC 🇷🇺
Gas Cylinder Degassing Station GAKS-KOB-UP

Gas Cylinder Degassing Station GAKS-KOB-UP

₸1,425,000-8,550,000
REMARM LLC 🇷🇺
Vertical Heat Exchanger NORDMATIC VT-K 75kW

Vertical Heat Exchanger NORDMATIC VT-K 75kW

₸997,500-2,850,000
RZKO LLC 🇷🇺
Expanded Oil Deflector MU-1000

Expanded Oil Deflector MU-1000

₸427,500-1,710,000
VACUUMASH OJSC 🇷🇺
UV Water Disinfection System UFU-10

UV Water Disinfection System UFU-10

₸427,500-1,425,000
ITC "COMPLEX RESEARCHES" LLC 🇷🇺
NORDMATIC HT-O 100kW Horizontal Air Heater Heat Exchanger

NORDMATIC HT-O 100kW Horizontal Air Heater Heat Exchanger

₸1,995,000-7,125,000
RZKO LLC 🇷🇺
Water Disinfection System UV Radiation DUV-1A120-N BSC

Water Disinfection System UV Radiation DUV-1A120-N BSC

₸427,500-1,425,000
LIT LLC 🇷🇺
Automatic Cooling Cabinet for Transformers - SHAOT-DC

Automatic Cooling Cabinet for Transformers - SHAOT-DC

₸712,500-2,850,000
LIDER-ENERGO LLC 🇷🇺
NORDMATIC HT-O Horizontal Air Heater 150kW

NORDMATIC HT-O Horizontal Air Heater 150kW

₸1,995,000-7,125,000
RZKO LLC 🇷🇺
Water Meter Tank with Steam Heating and Insulation BВ-100ET

Water Meter Tank with Steam Heating and Insulation BВ-100ET

₸4,275,000-14,250,000
SEMZ LLC 🇷🇺
Electric Shell-and-Tube Heater EH 25 for Oil, Fuel, and Water

Electric Shell-and-Tube Heater EH 25 for Oil, Fuel, and Water

₸85,500-855,000
PROMTECNOLOGIES LLC 🇷🇺
UV Water Disinfection System UFU-20

UV Water Disinfection System UFU-20

₸427,500-1,425,000
ITC "COMPLEX RESEARCHES" LLC 🇷🇺
NORDMATIC HT-O Horizontal Air Heater 50 kW

NORDMATIC HT-O Horizontal Air Heater 50 kW

₸712,500-2,280,000
RZKO LLC 🇷🇺
NORDMATIC VT-O Outdoor Vertical Heat Exchanger 800 kW

NORDMATIC VT-O Outdoor Vertical Heat Exchanger 800 kW

₸4,275,000-14,250,000
RZKO LLC 🇷🇺
Vertical Air Heater Heat Exchanger NORDMATIC VT-P 600 kW

Vertical Air Heater Heat Exchanger NORDMATIC VT-P 600 kW

₸712,500-2,280,000
RZKO LLC 🇷🇺
Vertical Air Heater Heat Exchanger NORDMATIC VT-K 800 kW

Vertical Air Heater Heat Exchanger NORDMATIC VT-K 800 kW

₸4,275,000-14,250,000
RZKO LLC 🇷🇺
Horizontal Heat Exchanger Air Heater NORDMATIC HT-K 50 kW

Horizontal Heat Exchanger Air Heater NORDMATIC HT-K 50 kW

₸712,500-2,280,000
RZKO LLC 🇷🇺
NORDMATIC VT-O Vertical Air Heater 500 kW

NORDMATIC VT-O Vertical Air Heater 500 kW

₸4,275,000-14,250,000
RZKO LLC 🇷🇺
NORDMATIC HT-O 700 kW Horizontal Air Heater Heat Exchanger

NORDMATIC HT-O 700 kW Horizontal Air Heater Heat Exchanger

₸4,275,000-14,250,000
RZKO LLC 🇷🇺

FAQ

What information do I need to provide for a quotation?
Four things: the two media (for example water/water or steam/oil), inlet and outlet temperatures on both sides, flow rates, and maximum working pressure. With these, the factory runs a thermal calculation and proposes a specific plate pack or tube bundle with documented performance margins.
Can a Russian plate exchanger replace an existing European unit?
In most cases yes, as a functional replacement matched to the same duty point and connection sizes. Suppliers do not copy proprietary plates, but they will size an equivalent unit and adapt flange positions where possible. Send the old unit's datasheet or nameplate photo for the fastest match.
What about gaskets and spare plates later on?
Gaskets and plates for the supplier's own models are stocked at the factory and ship worldwide by courier. A prudent practice for remote sites is ordering a gasket set and several spare plates with the unit itself — the added cost is small compared with downtime.
Are the exchangers pressure-tested and documented?
Yes. Units are hydraulically tested at the plant and shipped with a technical passport recording test pressure, materials and serial number, plus an EAC declaration where applicable. For oil and gas or municipal tenders, additional weld and material certificates can be arranged at order stage.
How fast can a custom-calculated unit be delivered?
Typical production time is 20 to 45 days after the thermal calculation is approved, depending on size and materials. Small brazed units often ship from stock. Add roughly two weeks of trucking to Central Asia or four to six weeks of sea freight to the Gulf, Africa or Latin America.