المنتجات — قطع غيار الشاحنات

Spring Energy Accumulator Brake Chamber 24/24 100-3519200-40

كاميرا тормозная مع طاقة الربيع 24/24 100-3519200-40

SAR 180-562.50
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺
Brake Chamber with Spring Energy Accumulator Type 30/24 25.3519301-62

غرفة فرامل مع مكثف طاقة زنبركي نوع 30/24 25.3519301-62

SAR 135-450
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺
Spring Energy Accumulator Brake Chamber Type 20/20 25.3519102-30

غرفة فرامل مع مكثف طاقة زنبركي نوع 20/20 25.3519102-30

SAR 157.50-562.50
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺
Brake Chamber Type 24 100-3519210-02

كاميرا فرامل نوع 24 100-3519210-02

SAR 33.75-135
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺
Air Brake Chamber Type 16 100-3519010-01

غرفة فرامل الهواء النوع 16 100-3519010-01

SAR 33.75-112.50
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺
Brake Chamber with Spring Energy Accumulator Type 20/20 25.3519101-30

غرفة الفرامل مع مكثف طاقة النوابض النوع 20/20 25.3519101-30

SAR 337.50-1,125
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺
Spring Energy Accumulator Brake Chamber Type 24/20 25.3519500-10

غرفة فرامل مع مكثف طاقة زنبركي نوع 24/20 25.3519500-10

SAR 337.50-1,125
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺
Pneumatic Connector Head Type "A" 100-3521010

رأس الموصل الهوائي نوع "أ" 100-3521010

SAR 33.75-112.50
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺
Palm Type Connection Head for Pneumatic Systems 100-3521110

رأس الاتصال من نوع "بالْم" 100-3521110

SAR 11.25-67.50
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺
Two-Section Brake Valve with Lever 100-3514008-31

صمام فرامل ثنائي القسم مع ذراع 100-3514008-31

SAR 337.50-1,125
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺
Two-Section Brake Valve for Dual Circuit System 100-3514208-30

صمام الفرامل الثنائي 100-3514208-30

SAR 337.50-1,125
ش.ذ.م.م "روسلافل نظم الفرامل 🇷🇺

الأسئلة الشائعة

•Are trailer couplings and kingpins compatible with European-built trailers?
The dominant dimensions in this catalogue follow the same standards used across the European trailer industry — 50 mm couplings, 2-inch and 3.5-inch kingpins and standard fifth-wheel interfaces — so compatibility with European-pattern trailers operated in your market is generally direct. Verify the standard designation in the listing against your equipment, and ask for the dimensional drawing when in doubt.
•How does buying a complete truck cab work in practice?
Cabs are listed by truck model and equipment level — bare shell, partially trimmed or fully equipped with glazing, panel and wiring. After a crash, importing an equipped cab is often cheaper and faster than panel-by-panel rebuild. Cabs ship bolted to transport frames, one or two per 40-foot container; lead time runs two to six weeks depending on configuration.
•Can brake chambers and safety-critical parts be traced to the manufacturer?
Yes — heavy-duty brake chambers, couplings and similar safety items carry factory markings, batch numbers and quality passports, and shipments include conformity declarations. Buying through the marketplace connects you to the producing plant or its authorized exporter, which matters in this product class where unmarked open-market copies are a known hazard.
•What is the smallest sensible order for a trailer-fleet operator rather than a dealer?
Operators commonly order a maintenance package: one season's wear parts for the fleet — brake chambers, couplings, landing-gear assemblies, suspension bushings — which typically fills a few pallets rather than a container. Suppliers accept this scale, and consolidating several factories' goods through one forwarder keeps freight reasonable. Single urgent assemblies can move by air.
•Do bus parts cover both mechanical and body components?
Both. The bus segment in this category includes structural items — panels, frames, brackets — alongside mechanical components, complementing the seats and glazing found in the interior and glass categories. For a refurbishment program, a combined request listing all positions lets the marketplace match each line to the appropriate factory and consolidate shipment.
•How long does delivery take to East African or Gulf ports?
Production or stock-picking typically takes one to four weeks depending on the items, then sea transit via Novorossiysk or St. Petersburg runs roughly 30–50 days to Gulf and East African ports including transshipment. Central Asian destinations are faster overland — about two to three weeks by truck. Heavy forged parts rarely justify air freight except in breakdown emergencies.