المنتجات — معدات البناء الثقيلة

Dual-Axle Static Roller for Efficient Road Construction RC-13-DD

مدحلة ثابتة مزدوجة المحور لبناء الطرق الفعال RC-13-DD

SAR 168,750-450,000
ش.م راسكات 🇷🇺
Dual-Axle Pneumatic Roller for Asphalt Compaction RC-24-SS

مدحلة هوائية مزدوجة المحاور لضغط الأسفلت RC-24-SS

SAR 157,500-450,000
ش.م راسكات 🇷🇺
Dual-Axle Vibratory Roller for Soil Compaction RV-20-DT

مدحلة اهتزازية مزدوجة المحور لضغط التربة RV-20-DT

SAR 157,500-450,000
ش.م راسكات 🇷🇺
Dual-Axle Vibratory Roller for Soil Compaction RV-17-DT

مدحلة اهتزازية مزدوجة المحور لضغط التربة RV-17-DT

SAR 157,500-450,000
ش.م راسكات 🇷🇺
Dual-Axle Vibratory Roller for Soil Compaction RV-14-DT

مدحلة اهتزازية مزدوجة المحاور لتسوية التربة RV-14-DT

SAR 180,000-562,500
ش.م راسكات 🇷🇺
Dual-Axle Vibratory Roller for Effective Soil Compaction DU-85

مدحلة اهتزازية مزدوجة المحور لتسوية التربة ديو-85

SAR 112,500-315,000
ش.م راسكات 🇷🇺

انشر طلب الشراء الخاص بك

احصل على عروض من موردين موثوقين

وفر وقتك
Dual-Axle Combined Vibratory Roller for Road Construction DU-84

أسطوانة اهتزازية مزدوجة المحور للتشييد الطرق DU-84

SAR 78,750-225,000
ش.م راسكات 🇷🇺
Dual-Axle Combined Vibratory Roller for Road Construction RV-12-DS

مدحلة اهتزازية مزدوجة المحاور لإنشاء الطرق RV-12-DS

SAR 157,500-562,500
ش.م راسكات 🇷🇺
Dual Drum Combined Vibratory Roller for Asphalt Compaction DU-99

مدحلة اهتزازية مزدوجة الأسطوانة لضغط الأسفلت DU-99

SAR 101,250-270,000
ش.م راسكات 🇷🇺
Combined Double-Axle Vibratory Roller for Asphalt Compaction RV-8-DS

رولر اهتزازي مركب مزدوج المحور لضغط الأسفلت RV-8-DS

SAR 135,000-360,000
ش.م راسكات 🇷🇺
Dual-Axle Combined Vibratory Roller for Asphalt Compaction RV-7-DS

مدحلة اهتزازية مزدوجة المحاور لدمك الأسفلت RV-7-DS

SAR 157,500-412,500
ش.م راسكات 🇷🇺
Dual-Axle Combined Vibratory Roller for Asphalt Compaction DU-97

مدحلة اهتزازية مزدوجة المحور لتسوية الأسفلت DU-97

SAR 78,750-225,000
ش.م راسكات 🇷🇺
Double Drum Vibratory Roller for Asphalt Compaction DU-98

مدحلة اهتزازية مزدوجة الأسطوانة لضغط الأسفلت DU-98

SAR 101,250-315,000
ش.م راسكات 🇷🇺
Dual Drum Vibratory Roller for Asphalt Compaction RV-9-DD

مدحلة اهتزازية مزدوجة الأسطوانة لضغط الأسفلت RV-9-DD

SAR 101,250-270,000
ش.م راسكات 🇷🇺
Dual Drum Vibratory Roller for Asphalt Compaction RV-7-DD

مدحلة اهتزازية مزدوجة الأسطوانة لضغط الأسفلت RV-7-DD

SAR 157,500-450,000
ش.م راسكات 🇷🇺
Dual-Drum Vibratory Roller for Asphalt Compaction DU-96

مدحلة اهتزازية مزدوجة الأسطوانة لضغط الأسفلت DU-96

SAR 135,000-360,000
ش.م راسكات 🇷🇺

الأسئلة الشائعة

How do I get spare parts after the machine arrives?
Agree a recommended spares kit with the factory at purchase — typically filters, wear plates, hoses and undercarriage items sized for 1,000–2,000 motohours. Afterwards, parts ship by air or groupage freight against the machine serial number. Many buyers keep a 5–10 percent of machine value in parts stock, which covers the first two seasons.
Are these machines adapted for hot and dusty climates?
Yes, tropical versions are standard order options: upgraded cooling packages, pre-cleaners and cyclone air filters, and cabin air conditioning. Russian machines already tolerate wide temperature ranges by design, but state your ambient maximum and altitude in the request so the plant fits the correct radiator and fan configuration.
What does shipping a bulldozer or roller actually cost and how is it done?
Smaller rollers and compactors travel in open-top or flat-rack containers; bulldozers and pavers usually go RoRo from Novorossiysk or St. Petersburg, sometimes partially disassembled with the blade and cab shipped separately. Sea freight to the Gulf or East Africa typically takes 25–45 days. Suppliers prepare the machine for marine transport, including preservation and lashing points.
Is operator training or commissioning support included?
Commissioning supervision is normally a paid option: a factory engineer attends startup, verifies assembly and trains your operators over 3–7 days. For simpler machines, plants provide English-language manuals, video instructions and remote support instead. Write the support package into the contract rather than assuming it.
What payment terms do machinery plants accept?
The common pattern is an advance of 30–50 percent with the balance before shipment, paid by bank transfer. Letters of credit are accepted by larger plants, though confirming banks should be discussed early given current banking routes. For repeat buyers, partial deferral against delivery documents is sometimes negotiable.
Do cementing units and treatment plants come with engineering support?
Yes. Oilfield cementing units and packaged wastewater plants are engineered products, so suppliers provide process calculations, foundation and utility connection drawings, and supervised commissioning. For treatment plants, you submit inflow volume and contamination data first; the plant then sizes the unit and guarantees outlet parameters in the contract.