مجموعة ترقية الأسطوانة ذات الضغط العالي لتوربين بخار T-100
US$90,000-600,000
Minimum scope of modernization:
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization:
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺
مجموعة ترقية التوربين البخاري K-215-130-1M3 لكتلة CND رقم 9
US$90,000-360,000
Maximum steam flow rate through CND:
480
Nominal temperature of fresh steam upstream of CVD stop valves:
540
ش.م سيلوفي ماشيني 🇷🇺
مجموعة تحديث التوربين T-100/120-130-2
US$300,000-1,800,000
Minimum scope of modernization:
Technical re-equipment of T-100/110-120 series turbine: life-saving units and parts operating at temperature more than 450C are replaced, which allows to renew the resource of the whole turbine, as well as to increase technical and economic indicators of t
Average volume of modernization:
In addition to replacing life cycle components and parts of the high-pressure cylinder, additionally includes replacing worn out elements of the medium-pressure flow part, thereby improving the reliability of the medium-pressure part.
ش.ذ.م.م القابضة تبلوإنيرغوسيرفيس 🇷🇺
مجموعة تحديث التوربين البخاري T-100
US$60,000-600,000
Minimum scope of modernization:
modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
Minimum scope of modernization:
modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺
مجموعة تحديث لكتلة التوربين CND K-210(215)-12.8
US$90,000-360,000
Rated power:
210
Maximum steam flow rate through CND:
480
ش.م سيلوفي ماشيني 🇷🇺
مجموعة أسطوانة التوربين عالي الضغط لترقية T-100-130
US$90,000-600,000
Minimum scope of modernization:
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization:
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺
مجموعة ترقية أسطوانة الضغط العالي لتوربين البخار PT-60
US$90,000-600,000
Minimum scope of modernization:
modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization:
modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
ش.م أورال 🇷🇺